On a daily basis, codes and regulations influence our activities. At their root, they provide minimum standards for safety, health and general welfare that allow us to safely carry out the various responsibilities we perform throughout our workday.

When it comes to blast-resistant buildings, the environment alone can be challenging. Then, if you introduce federal, state and local codes, you better be working with a company that knows what it is doing.

Early on, most blast-resistant building applications were fairly simple. The critical element was (and still is) to simply protect the people and assets inside. Over time, however, the demands on this type of building have expanded dramatically.

In many cases, these buildings have evolved into something much more complicated. That complexity is only compounded when trying to meet applicable codes and regulations. The importance of working with a modular building partner that fully understands not only the core application but also the codes and regulations that now impact them is critical.

RedGuard recognizes that permanent blast applications have moved well beyond temporary structures for turnaround work. We now regularly see modular blast-resistant buildings being specified in place of traditionally site-built construction. Features like improved quality control, reduced on site construction time frames, ability to meet higher blast loads, and flexibility in design elements can significantly tip the scales in favor of a modular solution.

Although completely different in their design, blast-resistant buildings are subject to the same codes, regulations and reviews as site-built structures. The unique combination of design elements necessary for blast resistance and typical building codes can often create conflict in that process.

All specific details of the project must be fully understood to ensure success. Some of these details may include fundamental elements like the general footprint, desired height, and what kind of spaces are required on the inside. But even more critical is knowing the details of the potential exposure.

Considering blast exposures is the obvious starting point, but it's also good practice to ask questions about other lifesaving elements and threat requirements. Some of the questions you should ask include:

  • What's the electrical classification of the area?
  • Does toxic release need to be considered?
  • Is there an exterior fire threat?
  • Does the building require positive pressure?
  • Is there a shelter-in-place requirement?

Once we understand the threat requirements, we can start evaluating how any federal, state or local codes might affect the building. For example, does the state require ADA access? Are there specific energy code requirements that could affect the insulation values or HVAC efficiencies? (An example of a conflict could be needing to increase the building height to accommodate extra insulation and more extensive ductwork due to a pressurized system.)

Building codes and state-specific requirements can be challenging since they vary from state to state. Consider two buildings with similar application requirements, but shipping to two different states. They may be required to have very different final designs due to the specific state and local codes. Many states also have their own review programs relating to modular constructed buildings. Some programs require approval before buildings are delivered. On site and in-progress inspections are common as well.

When working with a vendor that understands and scrutinizes all those factors, you should expect to answer many questions relating to the application and the specific scope of work. We'll evaluate and add all the other critical elements to make sure it not only meets the requirements for the application but also meets state and local code requirements. The good news is that once those elements are identified and understood, the design concept is well on its way.

If a formal scope or specification has not been created, no problem. The knowledgeable sales team at RedGuard can work with you to develop a concept that incorporates not only the critical lifesaving features but also all design elements for making it a compliant, comfortable and productive workspace.

For more information about blast-resistant buildings, or to speak to the writer of this blog post, schedule a call today. 

Is Reinforced Concrete Right For Your Next Blast Resistant ...

In an ideal situation, facility personnel would operate at a safe distance from potential accidental hazards. However, this is not always possible or practical, and essential personnel often need to be located closer to operations and potential hazards than we'd like. In those cases, it's necessary to provide protection from the hazardous exposures, which sometimes means the need for a blast resistant building.

Blast resistant buildings (BRBs), sometimes called blast resistant structures, are designed to withstand many of the blast hazards present in industrial environments. When the time comes to order a blast resistant structure to protect your employees, the number one question for most people is: what construction type should I purchase?

With a variety of materials to choose from, it can be tough to know which option is ideal for your situation.

Precast concrete construction is commonly used at industrial sites. This material offers distinct defensive qualities when used for blast resistant construction. As the original solution trusted for protective buildings, your facility might benefit from installing blast resistant structures made of this durable, ductile material.

Let's explore why reinforced concrete may be the right choice for your next blast resistant building.

The history of reinforced concrete and concrete blast resistant buildings

Reinforced concrete construction is a vital engineering material in a range of modern construction projects, including buildings, bridges, dams, storage facilities, and many more. Reinforced concrete is created by adding steel bars to a concrete cast before it cures. Once cured, reinforced concrete offers a ductile and durable building solution, especially compared to plain, unreinforced concrete or masonry, which has the propensity to crack.

In addition to ductility, reinforced concrete has good inertial and thermal mass properties, making it one of the best choices for blast resistant structures of all kinds. Bomb shelters during World War II, for example, made heavy use of reinforced concrete.

Construction practices for buildings in industrial and chemical plants changed over the years as the understanding of the hazards and mitigation approaches improved. This often resulted in high-occupancy permanent buildings being designed as blast resistant structures, and reinforced concrete remained a key option during that time. However, blast hazards were rarely addressed for temporary, portable building solutions which were brought on site for new construction projects where quick turnarounds were necessary.

In , an accident in Texas City irrevocably altered the way worker safety was considered in terms of portable building design and location.

An explosion at a major oil refinery in Texas City claimed the lives of 15 workers. This led to the revision of the American Petroleum Institute's (API) Recommended Practice 752, as well as the development of API Recommended Practice 753.

For more information, please visit explosion resistant materials.

API RP 752 (permanent buildings) and API RP 753 (portable buildings) were written to ensure that all future buildings intended to house occupants would be sufficiently protective for workers in the event of an accident or hazard threat.

With the introduction of API RP 753, many facilities that did not previously have protective portable buildings suddenly needed to acquire them ' and quickly. The immediacy of this need ushered in a new era of steel blast resistant buildings, thereafter designed and referred to as blast resistant modules (BRMs).

Steel's rise to prominence

Steel quickly became the premier building material when construction began on these new portable protective modules. Why? Because of speed.

Steel blast resistant modules could be constructed off-site, then finished or installed on-site, leading to faster completion times for new orders. As companies ordered more and more new BRMs to comply with safety protocols, steel became the go-to material choice for filling portable building orders fast.

As portable, modular structures made of steel became popular across the country in the industrial sector, facilities began installing multi-unit complexes as permanent buildings, often closer to process areas. Blast resistant concrete structures ' which until that point had been constructed primarily on-site ' became less popular due to the time requirements for cast-in-place concrete buildings.

The return of concrete

Today, the building industry has once again evolved, and precast concrete has become more commonplace for permanent building solutions.

Precast concrete consists of building components (wall panels, columns, beams, etc.) that are cast and cured in a controlled environment off-site, and then transported to the building site. While this is an expedited construction method compared to cast-in-place concrete, it still takes time to erect individual building components to create a complete building.

The need for a modular precast building solution, one which offered superior protection and expedited construction, was identified and developed by FORTRESS Protective Buildings using a proprietary precast concrete modular design.

FORTRESS created a one-of-a-kind precast concrete building, designed by industry leader BakerRisk. These new protective buildings offer much of the same flexibility and convenience as pre-made steel structures while retaining concrete's other inherent benefits. These advantages include excellent longevity and resistance against fire hazards and extreme weather.

With the development of FORTRESS protective buildings, modern blast resistant buildings made of reinforced concrete are now a quickly deployable, turnkey option. Like the sturdy bomb shelters of decades past, precast concrete offers excellent protection for site personnel against a variety of dangers. However, this new offering provides that protection in a modular, efficient design package.

Benefits of using precast concrete for blast resistant buildings

FORTRESS blast resistant buildings are constructed with precast reinforced concrete, taking full advantage of this material's many benefits and providing protection from a wide range of hazards.

Excellent fire resistance

Reinforced concrete offers some of the best heat load resistance compared to other blast resistant materials.

Because it does not conduct heat as well as other materials, concrete requires temperatures to reach many hundreds of degrees Fahrenheit for several hours before it loses its structural integrity. Additionally, heat transfer to the interior of the building can be minimized when designed appropriately. As a result, reinforced concrete provides superior protection against fires compared to non-cementitious construction.

Flying debris protection

Of course, reinforced concrete is not just fire resistant. It's also protective against fragment damage, defending personnel not only against the debris resulting from an explosion but also from extreme weather debris from hurricanes and tornados.

Low deformation

Reinforced concrete is also highly capable of resisting blast loads from explosions and similar dangers. Regular concrete already dissipates explosive energy well due to its mass, but thanks to the increased ductility provided by internal reinforcing steel, reinforced concrete can be designed to have low deformation under duress. This is particularly important to minimize internal debris from wall or ceiling mounted electrical, mechanical, and architectural items that are inherent in any occupied building.

Precast concrete reduces construction time

Facilities that need blast resistant structures constructed quickly may choose precast concrete for its relatively rapid turnaround time.

FORTRESS blast resistant buildings take installation speed a step further by eliminating the need to design buildings from scratch. Because each FORTRESS is constructed from four pre-designed structure plans that can be configured in flexible layouts to suit different client needs, it's even faster and easier to choose and install a FORTRESS when your facility needs one ASAP.

Depending on building size and function, FORTRESS's reinforced concrete structures may be ordered, assembled, and installed on accelerated timelines. For some buildings, such as small guardhouses, a FORTRESS could be assembled in as little as three to five weeks once modules have arrived on site. For bigger, more complex structures, such as large control rooms, timelines can often be compressed to meet the client's needs. The reduction in on-site construction time also mitigates site disruption and potential safety exposure.

Precast concrete ' the ideal material for a protective building

The realities of on-site building placement limitations or facility designs mean that you can't always follow the golden rule of operational safety: distance is your friend. Sometimes you need buildings near hazardous areas for operational response or monitoring.

When distance isn't an option, a FORTRESS blast resistant building could be your best choice.

Contact FORTRESS today to inquire about building plans, turnaround time, and more details about our turnkey protective building solutions.

If you want to learn more, please visit our website metal Leak-proofing material.