Aarsleff Ground Engineering is a leading UK sheet piling contractor with extensive experience and expertise in designing and installing specialist retaining wall solutions. With the experience of working on over 25 sheet piling projects per year, we’ve pulled together key information regarding sheet piling that will help you deeper understand the technique.
Sheet piling is used to provide both temporary and permanent walls. Sheet piling is used as excavation support and for soil retention. In simple terms, it creates a border that keeps the earth back, away from the structure.
Sheet pile walls are used to support excavations for various structures, including below-ground parking structures, basements, pump houses, and foundations, to construct cofferdams, and to construct seawalls and bulkheads.
Permanent steel sheet piles are designed to provide a long service life; however, when construction is taking place in a confined space, temporary walls may be used to prevent material ingress, offering protection to the workers working in the vicinity of the area.
In a home environment, sheet piling is used as permanent walls as they provide stability and durability to the interior walls (especially basement walls).
Chesterfield Associates Inc. commenced a project in November to replace the steel sheet piling on a pier at the Port Jefferson Ferry Terminal in New York state.
The pier at Port Jefferson Ferry Terminal is about 300 feet long and 80 feet wide. The original structure, made of wood timbers, is about a hundred years old. It has been reframed at least a couple of times, most recently in the late s.
A steel bulkhead ties into the landward end of the pier. Pile lengths required around the pier range from about 50 feet to 90 feet at the pier’s deepest point. The sheet piles installed in the s had deteriorated in many places.
The new piles, at 0.625-inches thick, should have a longer service life of 50 to 60 years. This was the first job ever that Chesterfield Associates worked on that required two high mats. Moving the mats alone required six tractor-trailer loads.
The longest sheet piles required for the depths of the project weighed eight tons a pair. Specialised stretch trailers transported two pairs at a time to the site.
Chesterfield Associates team extracted the old sheet piling from around the pier. About 40 metres of old piling was extracted and replaced at a time; the template used to hold the structure in line during this process is 40 feet long. Generally, the cycle of excavation, old pile extraction and new pile installation for the 40 feet would take two to three days, depending on bottom conditions; obstructions could add significantly to that time.
Requiring more power to install the new piling, the company rented a Model 50B vibratory hammer to drive up to 90 feet in the soil conditions at the pier.
Sometimes when the old piling was being extracted, some of the previous structures moved into the path of the new piling. Divers were required to enter the water to deal with the obstructions.
Do you have a project that would benefit from sheet piling? your enquiry to and an expert will be in touch.
Converting from a narrow, inefficient pile to a wide modern pile can save up to 27% on weight whilst offering equivalent driveability and strength.
In the s, the 525mm wide range overtook the older sections, offering much higher strength per unit weight but with reduced capacity to withstand sub-optimal driving practice. The 600mm wide U pile was initially resisted because of fears over driveability, but the efficiency and need to compete with Z piles soon overcame these reservations. The 600mm wide U pile is still the standard temporary works You pile today.
Larssen PU12 – 600mm width
Arcelor Mittal AZ – 630mm width
ArcelorMittal AU – 750mm width
Today we see even wider piles with U piles up to 750mm wide and Z piles up to 800mm wide. These piles offer maximised economy (optimised strength to weight ratio) but have clever additions such as strengthened shoulders to ensure driveability is not compromised.
A sealing system provides a cost-effective solution to control water seepage through the wall, for instance, to minimise the risk of settlement of adjacent property or keep excavations dry.
The water tightness of ArcelorMittal or Larssen interlocks invariably improves with time, but a sealant provides a means by which the flow of water can be controlled faster and more reliably.
The water flow through sealed interlocks can be calculated with a practical design method backed up by several in-situ full-scale tests.
Each construction project is unique because of ground conditions, water tightness requirements, installation methods and vary from site to site. Therefore, the choice of a sealing system must be made carefully considering all the specific constraints and requirements.
The integrity of a sealant will depend upon its suitability regarding the installation and the driving method, as well as the soil and water conditions.
Cantilever sheet piles are walls that do not have any supports and thus have a free, unsupported excavation. Cantilever walls restrain retained earth by the passive resistance provided by the soil below the excavation.
The design of the wall will determine how long the sheet piled wall can last. Sheet piled walls can be constructed to have a design life of 120 years.
With competitive price and timely delivery, Jianhua Holdings Group sincerely hope to be your supplier and partner.
See more advantages here: Top 10 Advantages of Sheet Piling – Aarsleff
The cost of a sheet piling project will, of course, depend on several factors. Mobilisation, materials, and labour costs need to be considered in the unit price, whether the wall is temporary or permanent and whether the contractor owns the steel sheet piles or has to buy them. You may even need to add additional costs for bracing or tiebacks.
Sheet piling is a versatile piling technique that offers schemes small and large, a sustainable, cost-effective slope stabilisation solution.
They may be designed to both retain temporary excavations and to act as permanent retaining structures.
Sheet pile walls are commonly used in service yards of commercial and retail sector developments, flood defence schemes, bridge abutments and boundary walls.
Sheet pile retaining walls have distinct advantages over concrete contiguous and secant walls. Besides being more cost-effective, they require no curing time before excavations can commence, thus allowing shorter programmes.
Concrete piling is a strong and reliable choice for building docks and other structures. It provides solid support and stands up well against the challenges of wet environments. In this article, you will learn about various types of concrete piling. You will also find out when and why to use them, especially in Charleston, South Carolina.
For more insights on marine construction techniques, feel free to explore our detailed guide on marine construction best practices.
Concrete piling helps support structures, especially near water. When building a dock, you want something that will last. Concrete piles are made from strong materials, which makes them a good choice for marine construction. They provide stability and can handle heavy loads.
Concrete piles are long columns made from poured concrete or precast concrete. They act like strong legs for your dock. When you place them deep into the ground, they can support the weight of the dock and anything on it. These piles can stay in water without breaking down, which makes them great for Charleston's coastal areas.
There are two main types of concrete piling: cast-in-place and precast. Each has its unique way of being made and used.
Cast-in-place piles are made right where they will be used. Workers dig a deep hole and pour concrete into it. This method allows for customization. If the site has special conditions, the pile can be adjusted during the process.
Precast piles are made in a factory and then transported to the site. They are already shaped and ready to go. This saves time during construction since you don’t have to wait for the piles to be made on-site.
Choosing the right time to use concrete piling depends on several factors, especially in Charleston where the coastal environment can be tricky.
If your dock is going to be near saltwater, concrete piling is a smart choice. Saltwater can wear down other materials quickly. Concrete is more resistant, making it last longer.
Think about what your dock will hold. Will it have heavy boats? Will people frequently walk on it? If so, concrete piling is strong enough to handle that weight.
Before starting your project, check with local authorities. Sometimes, there are rules about how deep the piles need to go or what materials can be used. It’s best to know these regulations early on.
Whether you choose cast-in-place or precast piles, knowing how the installation works can help you understand the project better.
Using high-quality concrete is very important. Not all concrete is the same. Some mixes are better suited for marine environments. It’s crucial to choose a mix that can resist cracking and wear from water exposure.
When planning your dock project, costs can vary widely between cast-in-place and precast piles.
Concrete piling is a reliable option for your dock construction needs. Whether you choose cast-in-place or precast piles, both have their strengths. The best choice depends on your site conditions, project needs, and budget.
In Charleston, using concrete piling can help your dock withstand both the elements and the test of time. By understanding your options and the installation process, you can make a more informed decision.
If you’re interested in exploring other marine construction services, check out our page on dock repair solutions for more information.
At Baker Marine Contracting, we understand the unique needs of marine construction in Charleston. With over 10 years of experience, our team is ready to help you build the dock of your dreams. We use quality materials and skilled craftsmanship to ensure your project is a success.
If you’re ready to enhance your waterfront property, contact us for a free consultation. We will walk you through the process and help you choose the best options for your needs.
Concrete piling is more than just a construction method. It’s about creating a lasting connection between your property and the beautiful waterways of Charleston. By choosing the right piling for your dock, you ensure that your investment stands strong for years to come.
If you have questions or want to discuss your project, reach out to us at Baker Marine Contracting. We are excited to help you make your waterfront dreams a reality.
For more information, please visit Precast Pile Manufacturer.