How to choose the right explosion proof vacuum

23, Sep. 2024

 

How to choose the right explosion proof vacuum

Choosing equipment like our certified hazardous and explosive material vacuum cleaners or other power tools requires an understanding of the explosion and fire risks of an area. It is also vital that people working nearby are aware of the dangers in their work environment. In order to assist with the selection of electrical equipment, NEC Chapter 5, Articles 500-506 use the class/division/group system to indicate the different risk levels. Zone/group systems are also used sometimes by designers, based on NEC Articles 505 & 506 and developed by the International Electrotechnical Commission.

NFJ are exported all over the world and different industries with quality first. Our belief is to provide our customers with more and better high value-added products. Let's create a better future together.

Class defines the kind of hazardous material present in the area.

  • Class I (Article 501):

    Combustible or flammable gasses or vapors are present. (e.g., hydrogen, gasoline)

  • Class II (Article 502):

    Combustible dust is present. (e.g., grain dust is a silo)    

  • Class III (Article 503):

    Easily ignitable fibers are present. (e.g., cotton fibers in a textile mill)

Division defines the likelihood that a hazardous material may be present in sufficient quantities to ignite or explode.

  • Division I:

    There is a high probability that sufficient quantities of an ignitable substance may be present during normal operating conditions, repair or maintenance, or equipment breakdown.

  • Division II:

    There is a low probability that sufficient quantities of an ignitable substance may be present during normal operating conditions. Hazardous conditions would only exist if a flammable substance were released during an accident or the failure of the ventilation system that removes ignitable contaminants from the space.

Group defines the type of hazard in the atmosphere.

  • Group A:

    Acetylene

 Groups B through D identify the flammable substances in the atmosphere based on their maximum experimental safe gap (MESG) and minimum igniting current (MIC) ratio.

  • Group B:

    Substances with either an MESG value equal to 0.45 mm or a MIC ratio less than or equal to 0.40 (examples include hydrogen or similar gasses).

    Contact us to discuss your requirements of explosion proof materials. Our experienced sales team can help you identify the options that best suit your needs.

  • Group C:

    Substances having either an MESG value greater than 0.45 mm and less than or equal to 0.75 mm, or a MIC ratio greater than 0.40 and less than or equal to 0.80 (examples include ethylene or similar gasses).

  • Group D:

    Substances having either an MESG value greater than 0.75 mm or a MIC ratio greater than 0.80 (examples include propane or similar gasses).

  • Group E:

    Atmospheres containing combustible metal dusts, including aluminum, magnesium, and their commercial alloys, or other combustible dusts whose particle size, abrasiveness, and conductivity present similar hazards in the use of electrical equipment.

  • Group F:

    Atmospheres containing combustible carbonaceous dusts that have more than 8 percent total entrapped volatiles or that have been sensitized by other materials so that they present an explosion hazard. Coal, carbon black, charcoal, and coke dusts are examples of carbonaceous dusts.

  • Group G:

    Atmospheres containing combustible dusts not included in Group E or F, including flour, grain, wood, plastic, and chemicals.

 

The Ultimate Guide for Blast-Resistant Buildings

CONSTRUCTION OF THE BLAST-RESISTANT BUILDING

Because they are modular in nature, the construction of blast-resistant buildings happens before they ever get to your site. This is one of the greatest benefits of modular construction.

In short, this means there's much less of an impact on your site operations. There's no period of downtime for the space the building will occupy. There's no working around the mess of a construction site. There's no re-routing of trucks. 

During the construction phase, the customer will get updates as needed, including progress photos. There's no way to nail down how long the construction of a blast-resistant building will take because each project is different. It's all dependent on the construction queue of the vendor, the size of the building, and the complexity of design and elements. 

A typical build, for example, a simple three-plex or smaller, may take 16-20 weeks from the time drawings are approved. Other complex projects will take more time. Your vendor should be able to talk in more detail about this, based on the specs of your individual project. There are occasionally ways to expedite builds, but it's not a good practice to rely on that to happen. 

The last thing to happen while the building is still at the vendor site is the factory acceptance test. The building is put together at the facility, just like it would be on the customer's site. Some customers may choose to do a final onsite walk-through; others may give approval based on photos of the finalized building. This can typically be done in a day. 

 

TRANSPORTATION AND INSTALLATION

Once the final walk-through has happened, there will be no time wasted before the build is on the road. If the building is a multi-plex, it could take several trucks to get it to its final destination. 

Some companies have their own transportation fleet, while others rely on outside sources. And some will use a combination of their own trucks and third-party transportation sources. 

 

PROJECT MANAGEMENT CHALLENGES 

According to the project managers at RedGuard, working through the design process without delays is the biggest challenge in managing blast-resistant building projects. 

Designing a building requires a lot of information and input from the customer. Sometimes there is information that is not available during the bid phase. 

 

AWAITING DETAILS

Examples of some information that may not be available before the PO is issued are things like the actual electrical load requirements for equipment that is supplied by the customer, the expected use for each room in the building, and final details like color or finish selections. Waiting on these things can slow down the initial design process. 

 

GETTING EVERYONE INVOLVED

Another hold-up is that sometimes the person who's been involved on the customer side, the purchasing agent, isn't the end-user of the blast-resistant building. Once the end-users become involved, they may have valuable information or knowledge of the project that will require changes during the initial review.  For this reason, it's helpful when decision-makers and the building's users are both involved during the bid process, so all details are resolved prior to project award. 

 

CHANGE ORDERS

Change orders are a fact of life in the management of blast-resistant building projects, so it's not the worst-case scenario when they come up, but avoiding them will always save you time and money. Following the advice here, as well as keeping the lines of communication open, and the team informed, will serve you well. 

 

WRAPPING IT UP

At RedGuard, we design and build blast-resistant buildings and have been doing it since . All the related details are on our minds every day, for at least 40 hours a week, but we know that our customers have more to think about. That's why our team of experts, in Sales, Estimating, Engineering, and Project Management, are ready and willing to answer your questions and consult on your project. 

No matter how much experience you have with capital projects or turnarounds, let's start talking about your goals and see if it makes sense to put a RedGuard blast-resistant modular building on your worksite. 

No two hazardous worksites are alike, so no two blast-resistant projects are alike. Our expert team can help you start planning your project to save you time, money, and, most importantly, lives

With this in mind, it is important to note that blast-tested buildings are usually given specific psi ratings. Knowing what rating your facility needs, will depend on many factors, such as the type of structure, the likelihood that it will experience a blast event, and its proximity to different assets, equipment, and materials. For example, a laboratory BRB that is near a blowdown stack might need an 8 psi rating, while a structure that is located closer to the perimeter of your facility might only need a 4 or 5 psi rating. (These are hypothetical and don't represent actual recommendations.) 

Want more information on Inorganic friction powder for clutches? Feel free to contact us.