Economical Column Design (Rule of Thumb) 3

10, Jun. 2024

 

Economical Column Design (Rule of Thumb) 3

INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

For more information, please visit our website.

Contact US

FIRST NAME

*


LAST NAME

*


*


MESSAGE

*


ADDITIONAL DETAILS

Thanks. We have received your request and will respond promptly.

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!

  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
Join Us!

*Eng-Tips's functionality depends on members receiving . By joining you are opting in to receive .

Posting Guidelines



Students Click Here

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Eng-Tips Posting Policies

Contact US

3

thread507- Forum Search FAQs Links MVPs
  • Forum

  • Search

  • FAQs

  • Links

  • MVPs

Economical Column Design (Rule of Thumb)

Economical Column Design (Rule of Thumb)

struggle67

(Structural)

(OP)

21 Oct 20 08:56

Hi

I am new to columns or any vertical member design. I only know some of the basic theories.

Lets say I am free to choose whatever column size I want. May I know based on your experience, where is the most economical point (NEd, MEd) on the column-interaction diagram? Reinforcement ratio? 2%? And why?

Thanks, and Best Regards,

RE: Economical Column Design (Rule of Thumb)

2

Trenno

(Structural)

21 Oct 20 09:06

Columns with minimum moment:

For Stocky columns 0.5*f'c at Le/r=20
For Slender columns 0.4*f'c at Le/r=35 ; 0.3*f'c at Le/r=45 ; 0.2*f'c at Le/r=60 and 0.05*fc at Le/r=100


Effective Length (Le) = Length * K-fixity factor. Conservative to assume k=1.0.
Radius of Gyration (r) = sqrt (Imin/A) or 0.3*min dimension for rectangular and 0.25*radius for circular.




RE: Economical Column Design (Rule of Thumb)

JLNJ

(Structural)

21 Oct 20 12:59

Like so many simple questions, the answer is complicated.

Given that reinforcement is expensive, choose a column size where the reinforcement needed is the bare minimum. Of course, there are code-required reinforcement and detailing minimums for ductility. The higher your seismicity, the more additional requirements there are

If possible, you want to make your column sizes as uniform as reasonably possible and vary the reinforcement where additional capacity is needed. Consult with local contractors as to which nominal sizes have standard formwork available.

Round columns are probably the most "efficient" for axial-load-dominated columns, but round formwork and spiral ties can be expensive.

One of the biggest gripes from the field is the congestion of the rebar where the girders connect into the columns. A few big bars in the girders and a few big bars in the columns can make rebar placement a nightmare. Or an impossibility. If you sketch the bars to scale you get a sense of whether or not your joint is constructible.

High strength concrete gives you, well, high strength columns. Know what materials are available in your region and specify them appropriately. You can spec different strength concrete for columns than the floor framing, but you better have excellent quality control to make it happen.

I worked on a hospital where the bulk of the columns were 20"x20" with (4) #9 bars. Exactly 1% and just 4 bars in the columns. It doesn't get more efficient than that.

RE: Economical Column Design (Rule of Thumb)

engineering_patrol

(Structural)

21 Oct 20 17:20

Trenno, that's a good explanation thanks man

RE: Economical Column Design (Rule of Thumb)

Agent666

(Structural)

21 Oct 20 17:36

Quote:

I worked on a hospital where the bulk of the columns were 20"x20" with (4) #9 bars. Exactly 1% and just 4 bars in the columns. It doesn't get more efficient than that.


Just be aware most codes would have limits on the spacing of reinforcement on each side of the member and on the minimum number of longitudinal bars (usually more than 4). The rules are there to ensure good ductility and confinement. So make sure you follow all your local rules. Start typically by satisfying all the detailing provisions for your chosen column size and then increase bar size until you satisfy the strength requirements. If you predominantly have flexure in one direction, then varying the bar size first on the compression amd tension faces is obviously more efficient. Having different sized bars in different locations is relatively easy. But too many changes makes the chances of getting something wrong on site more of a prospect.

One thing I've noted in the past is the amount of reinforcing going into the stirrups can be significantly more than you expect, but people concentrate on longitudinal reinforcement only when optimising. Sometimes for heavier columns your confinement reinforcement may be greater than 50% of the total reinforcement by weight. So don't forget to review that.

Just be aware most codes would have limits on the spacing of reinforcement on each side of the member and on the minimum number of longitudinal bars (usually more than 4). The rules are there to ensure good ductility and confinement. So make sure you follow all your local rules. Start typically by satisfying all the detailing provisions for your chosen column size and then increase bar size until you satisfy the strength requirements. If you predominantly have flexure in one direction, then varying the bar size first on the compression amd tension faces is obviously more efficient. Having different sized bars in different locations is relatively easy. But too many changes makes the chances of getting something wrong on site more of a prospect.One thing I've noted in the past is the amount of reinforcing going into the stirrups can be significantly more than you expect, but people concentrate on longitudinal reinforcement only when optimising. Sometimes for heavier columns your confinement reinforcement may be greater than 50% of the total reinforcement by weight. So don't forget to review that.

RE: Economical Column Design (Rule of Thumb)

dik

(Structural)

21 Oct 20 23:45

Quote (Columns with minimum moment:)


Great rule of thumb... been around for 50 years that I know of...

Trenno:Great rule of thumb... been around for 50 years that I know of...

Rather than think climate change and the corona virus as science, think of it as the wrath of God. Feel any better?
-Dik

RE: Economical Column Design (Rule of Thumb)

struggle67

(Structural)

(OP)

22 Oct 20 05:41

Trenno, Thanks That will surely useful for me later on.

I am also curious that in the interaction diagram below is point C considered better / more efficient than points B & D due to this enhanced moment capacity?





Hi Thanks Everyone,Trenno, Thanks That will surely useful for me later on.I am also curious that in the interaction diagram below is point C considered better / more efficient than points B & D due to this enhanced moment capacity?

RE: Economical Column Design (Rule of Thumb)

Lomarandil

(Structural)

22 Oct 20 05:45

Chasing point C (which I believe is what you meant) will usually create false economy if column formwork sizes change and layout becomes more complicated.

----
just call me Lo.

RE: Economical Column Design (Rule of Thumb)

Trenno

(Structural)

22 Oct 20 06:16

Notice how slenderness effects kick in at Le/r = 20.



I believe forum member IDS produced the following chart (AS).Notice how slenderness effects kick in at Le/r = 20.

RE: Economical Column Design (Rule of Thumb)

KootK

(Structural)

22 Oct 20 15:18

Quote (OP)

I am also curious that in the interaction diagram below is point C considered better / more efficient than points B & D due to this enhanced moment capacity?


Much depends on how you're defining "better" and "more efficient".

1) [C,D,E] are better than [A,B] from an engineering and safety perspective because values below the balanced point [C] will produced a more ductile failure mode not governed by rebar yielding rather than concrete compression failure. This may be of enhanced importance in situations of high seismic demand.

2) [E] is basically a beam rather than a column and in many instances, I would consider that economical and spatially inefficient.

3) In the lower stories of a high-rise building where moments become negligible relative to axial demand in gravity columns, I feel that even being as low as [C] on the graph represents economical and spatial inefficiency.

Like others, I feel that formwork and congestion concerns dominate concrete column economy.

As far as I'm concerned, circular columns are for architects. The circular bar pattern always seems to cause congestion issues for me. If I'm not overly concerned about confinement issues around the outside of a circular column, I'll usually just stuff a square cage in there.

Much depends on how you're defining "better" and "more efficient".1) [C,D,E] are better than [A,B] from an engineering and safety perspective because values below the balanced point [C] will produced a more ductile failure mode not governed by rebar yielding rather than concrete compression failure. This may be of enhanced importance in situations of high seismic demand.2) [E] is basically a beam rather than a column and in many instances, I would consider that economical and spatially inefficient.3) In the lower stories of a high-rise building where moments become negligible relative to axial demand in gravity columns, I feel that even being as low as [C] on the graph represents economical and spatial inefficiency.Like others, I feel that formwork and congestion concerns dominate concrete column economy.As far as I'm concerned, circular columns are for architects. The circular bar pattern always seems to cause congestion issues for me. If I'm not overly concerned about confinement issues around the outside of a circular column, I'll usually just stuff a square cage in there.

RE: Economical Column Design (Rule of Thumb)

hardbutmild

(Structural)

22 Oct 20 16:20

Quote (Trenno)

Columns with minimum moment: For Stocky columns 0.5*f'c at Le/r=20...

Does this mean that the axial capacity of a minimum moment column is 0,5*fc'*column_area for Le/r=20?

Does this mean that the axial capacity of a minimum moment column is 0,5*fc'*column_area for Le/r=20?

RE: Economical Column Design (Rule of Thumb)

KootK

(Structural)

22 Oct 20 16:49

I've got a related question that would fit in well here although it will be kind of an ugly ask.

I have a printout of an amazing concrete concrete design spreadsheet prepared by another firm which I cannot share. It does pretty much an entire high-rise building with detailing, shear stud reinforcing etc. I would not feel comfortable calling them up and asking about the inner working of their intellectual property.

The most interesting part of the spreadsheet, to me at least, is that it seems to deal with preliminary design very handily. There's a bit in the documentation where they basically say "If Mb < 2.5 MPa, don't sweat the reinforcing, something will work. This confirms that the column size will be adequate and the reinforcing can be sorted out later". If you think about the work flow on a typical high-rise concrete building, this is a hugely powerful tool if it's legit. Nobody cares what the rebar is early on but being able to dial in sizes for your architect with minimal effort is a big win. Trouble is: I don't know anything about this 2.5MPa method. The spreadsheet setup suggests that Mb = Moment / Section modulus. That makes sense to me but why 2.5MPa should be a reasonable limit is not apparent to me.

Anybody know anything about this method? Maybe it comes from some ancient text book or ACI paper I don't know of? Part of what may make this difficult to parse out is that the 2.5MPa is in metric units and may well be a modified version of something else that would have been expressed in imperial units that would probably be easier to identify.

RE: Economical Column Design (Rule of Thumb)

dik

(Structural)

22 Oct 20 17:10

You want to keep the same column size for 3 or 4 floors, and not change each floor, or keep the same size.

Link to Zolo

Rather than think climate change and the corona virus as science, think of it as the wrath of God. Feel any better?
-Dik

RE: Economical Column Design (Rule of Thumb)

Agent666

(Structural)

22 Oct 20 17:20

I'd say it just results in an infinitesimally small moment.

For example for a 600 x 600 column the 2.5MPa limit calcs out to a moment of 90kNm. Minimum steel would probably net you several times this, and if subject to any seismic loads or gravity loads with any sort of reasonable beam span 90kNm would be quickly exceeded.

I'm not aware of anything formally noting this type of thing. But it sounds more like a best practice/experience limit they have found?

RE: Economical Column Design (Rule of Thumb)

jayrod12

(Structural)

22 Oct 20 17:21

I feel that the 2.5MPa makes a lot of sense when you actually think about it and compare it to Trenno's guidance. That's likely going to be pretty close to 0.1fc' for moderately slender columns and if you end up with a highly slender column, you go up to 50 or 60 MPa and then you're at the 0.05fc' intent.

RE: Economical Column Design (Rule of Thumb)

KootK

(Structural)

22 Oct 20 17:25

Quote (Agent666)

But it sounds more like a best practice/experience limit they have found?


Thanks Agent, you may well be right about that.

Thanks Agent, you may well be right about that.

RE: Economical Column Design (Rule of Thumb)

hardbutmild

(Structural)

22 Oct 20 17:28

Quote (KootK)

If Mb < 2.5 MPa, don't sweat the reinforcing

For rectangular columns:
M/(bh2/6) = 2,5 MPa
M/(bh2) = 2,5/6

Since non-dimensional moment mi = M/(bh2fc)
M/(bh2) = mi*fc

mi*fc = 5/12

If concrete of 30 MPa is used (around 4 ksi) and partial factor of safety is 1,5 (design strength is 20 MPa):
mi < 0,02

Isn't this very low (for higher concrete strengths, this moment is even lower)? Looking at an interaction (Moment - axial force) diagram, this seems like an area with less than minimum reinforcement.

Or did I miscalculate something?

For rectangular columns:M/(bh/6) = 2,5 MPaM/(bh) = 2,5/6Since non-dimensional moment mi = M/(bhfc)M/(bh) = mi*fcmi*fc = 5/12If concrete of 30 MPa is used (around 4 ksi) and partial factor of safety is 1,5 (design strength is 20 MPa):mi < 0,02Isn't this very low (for higher concrete strengths, this moment is even lower)? Looking at an interaction (Moment - axial force) diagram, this seems like an area with less than minimum reinforcement.Or did I miscalculate something?

RE: Economical Column Design (Rule of Thumb)

KootK

(Structural)

22 Oct 20 17:28

Quote (jayrod12)

...and if you end up with a highly slender column...


Thanks for your contribution. The documentation does, in fact, start off by saying that most of the columns in their typical building will wind up being slender. You know the drill in the residential towers: 300x, 250x, 200x. The dreaded slender wallumn that will persist until explicitly prohibited.

Thanks for your contribution. The documentation does, in fact, start off by saying that most of the columns in their typical building will wind up being slender. You know the drill in the residential towers: 300x, 250x, 200x. The dreaded slender wallumn that will persist until explicitly prohibited.

RE: Economical Column Design (Rule of Thumb)

KootK

(Structural)

22 Oct 20 17:30

Quote (hardbutmild)

Isn't this very low (for higher concrete strengths, this moment is even lower)?


It is. To be honest, the setup is opaque enough to me that I may well be missing a 12 x multiplication somewhere or something. So I'd like to not get too caught up on the particular values. I'm really just interested to know if there are any good sizing methods out there that do account for significant moments and slenderness. This is the first that I've seen. And it may well be that it's just hugely conservative. Based on the work to which this setup would typically be applied, the moments would generally be quite small relative to the axial demand as they would be mostly just slab moments modelled with very liberal estimates of column stiffness.

It is. To be honest, the setup is opaque enough to me that I may well be missing a 12 x multiplication somewhere or something. So I'd like to not get too caught up on the particular values. I'm really just interested to know if there are any good sizing methods out there that do account for significant moments and slenderness. This is the first that I've seen. And it may well be that it's just hugely conservative. Based on the work to which this setup would typically be applied, the moments would generally be quite small relative to the axial demand as they would be mostly just slab moments modelled with very liberal estimates of column stiffness.

[Post Deleted]

RE: Economical Column Design (Rule of Thumb)

Settingsun

(Structural)

22 Oct 20 20:43

Maybe the 2.5 MPa is an approximation to flexural tensile strength and therefore minimum bending strength. 2.5 MPa = 0.6 * sqrt( psi).

RE: Economical Column Design (Rule of Thumb)

Lomarandil

(Structural)

23 Oct 20 06:23

That was my first thought too Steve, but I don't think your conversion works.

----
just call me Lo.

RE: Economical Column Design (Rule of Thumb)

Settingsun

(Structural)

23 Oct 20 06:53

0.6 *sqrt(f'c) is for metric units, so you convert psi to 17.2MPa before running the calc.

RE: Economical Column Design (Rule of Thumb)

Lomarandil

(Structural)

23 Oct 20 09:45

Ah, right you are!

----
just call me Lo.

RE: Economical Column Design (Rule of Thumb)

Celt83

(Structural)

23 Oct 20 13:13
Pu = PhiPn,max = 0.85*0.65*((0.85*F'c*(Ag-Ast))+(Fy*Ast))

substitute Ag = b*h and Ast = (1/100)*b*h

Determine a M,min as (0.6+0.03*h)*Pu

Then the max ratio of Secondary to First order moments is 1.4, so M = M,min/1.4

divide both sides by s = b*h*h / 6

From here I plugged in Fy = 60,000 psi, F'c = [,,,] and h = [12,18,24,36]

This results in PSI values so I divided by 145 to get Mpa. The 24 and 36 h at the lower F'c comes in near 2.5



Steveh49 likely has it, but I found some fun new math software so took it for a spin.

My Personal Open Source Structural Applications:
https://github.com/buddyd16/Structural-Engineering

Open Source Structural GitHub Group:
https://github.com/open-struct-engineer

I looked at taking:Pu = PhiPn,max = 0.85*0.65*((0.85*F'c*(Ag-Ast))+(Fy*Ast))substitute Ag = b*h and Ast = (1/100)*b*hDetermine a M,min as (0.6+0.03*h)*PuThen the max ratio of Secondary to First order moments is 1.4, so M = M,min/1.4divide both sides by s = b*h*h / 6From here I plugged in Fy = 60,000 psi, F'c = [,,,] and h = [12,18,24,36]This results in PSI values so I divided by 145 to get Mpa. The 24 and 36 h at the lower F'c comes in near 2.5Steveh49 likely has it, but I found some fun new math software so took it for a spin.My Personal Open Source Structural Applications:Open Source Structural GitHub Group:

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.


Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members! Already a Member? Login



News


5 things you need to know when choosing your formwork ...

News

Summary

Whether its better for a company to rent or purchase formwork items and systems depends on the kind of project under development and the time it will take to complete. Either way, the supplies needed must be of high quality and durability to ensure the timely, accident-free completion of the work. This means that your formwork provider should be a professional who has the requisite capacity to meet a projects needs, as well as the technical know-how to customize options and deliver.

Therefore, it is advisable that you watch out for suppliers with a limited product range. Often they will cut prices on standard-forming jobs but will have to quit when it comes to the more challenging part where know-how is needed. By contrast, a more experienced provider with an extensive range can supply custom-made forms.

Ultimately, it pays to only buy or rent from established companies with extensive experience. Ensure that the company you select offers professional and on-time design, with the technical capabilities to provide support to your engineering teams. You should be wary of formwork companies that offer discounted rates as they tend to use counterfeit products. Moreover, they do not maintain equipment to the best standards. This fails to provide the safety and peace of mind that you need to ensure quality work on your project.

In this report, we highlight what you should look out for when choosing a formwork provider for your construction needs.

INDEX

ADDITIONAL FORMWORK RECOMMENDATIONS

5 THINGS YOU NEED TO KNOW WHEN CHOOSING YOUR FORMWORK PROVIDER

When it comes to choosing your formwork provider, you cannot afford to make your decision too quickly. There are specific things that you need to look for when purchasing or hiring formwork systems. The correct formwork can make a construction project a success, whereas using the wrong systems can literally bring down a building.

Formwork makes up about 1.2% of the total costs of a buildings structural work. But you would be incorrect in thinking the role it plays is simple and insignificant. In fact, choosing good quality from a reliable provider is one of the most important decisions youll make for your project.

Here are five things you need to look for when selecting a formwork provider for your next construction project.

  1. Safety and quality

It goes without saying that safety and quality are of the utmost importance with any type of formwork or scaffolding. Thats why you should look for a provider who is committed to the following:

  • Meets certification: Devastating accidents can happen when forms are removed too soon before the building material has set. Equally, poor and under-designed formwork can bend or even break during the filling process because it does not meet certification.
    Make sure your supplier and their products meet the necessary safety standards set by your country or region for construction work and products. It pays to familiarize yourself with the certificates required, and cross-check if your formwork provider has them.
  • Cares about quality: You must consider your providers product in the decision-making process.
    For example, steel-framed wall formwork with standard plywood facing requires more maintenance and repair than a hot-dipped galvanized steel frame that uses specially manufactured plywood designed for longer life.
  • Meets maintenance standards: Before deciding on your formwork provider, you need to ensure that they thoroughly inspect and test their hire equipment to guarantee the strength and quality of each piece.
    You will be surprised to find out that not many companies invest in the meticulous upkeep and maintenance of their hire equipment.
  • Does not use counterfeit materials: The use of counterfeit products is a major cause of accidents on project sites. Thats why its important to know the difference between a genuine product that can bear your required workload.
    Sourcing from an inexperienced or questionable formwork provider means that you may receive a faulty product, which can have dangerous consequences. It helps to know that the Middle East is a major market for counterfeit products due to the high number of imports and exports in the region.One way you can identify counterfeit formwork products is if the discount is too good to be true. Products certified by the manufacturer will not be available at steep discounts, whereas counterfeit items, which use inferior materials, can offer a lower price point, but it comes with the potential for catastrophic consequences.
  • Enjoys good industry reputation: A formwork provider who has repeat business and customer recommendations will also have a market reputation for safety and quality.

  1. Value for money

The simple truth is that quality formwork systems do not have to be exorbitantly expensive. In designing and building formwork, you should aim for maximum economy, which you can do by focusing on the following points:

  • Clever design can contribute greatly to the overall costs. Find a form provider who can offer expert engineering and technical support to projects of all shapes and sizes.
    The formwork should be well-priced, with systems that are durable, reusable, and quick to erect. Well-engineered formwork will give your project enhanced productivity whilst reducing expense.
  • Your formwork provider should offer updated systems to help you reduce, or ideally altogether remove, the need for conventional formwork like timber and plywood.
    More old-fashioned kinds of formwork have more wastage and are typically designed as single-use.  Using a modern, more up-to-date system is better for your projects bottom-line and the environment.
  • Be wary of huge price differentials. Expanding on the point above, as a buyer you need to be conscious of how products should be priced so that you can understand when you are getting a cost-effective solution versus a suspect, possibly counterfeit, product.
    If the product is more than 20% cheaper than other systems, that should raise some red flags. More likely than not, heavily discounted products are counterfeit and could be ineffective, or possibly dangerous.

  1. Experience

Look for someone with proven formwork experience across a variety of sectors. The following factors will help you determine if a possible provider has the experience you need for your project.

  • Market reputation: Reputations are built through repeat success, over several different kinds of projects.
    Not all projects are the same, and you want a provider with a commitment to service excellence and a can-do approach, no matter the type of project.
  • Low accident rate: Whilst it may not be possible to find a formwork provider with absolutely no accidents in their entire history, you should look for someone with the least number of incidents.
    Ensure that the formwork they provide is strong and well-maintained and can work across all weathers especially bear the expansion and contraction that comes from extreme heat and cold.
  • Local industry familiarity: Sourcing someone who has worked in the local market means that they are familiar with the nuances of climate constraints, logistics support, as well as local workforce idiosyncrasies. It also gives them the added advantage of responding quickly and with flexibility.
  • Credit history: Its an industry fact that the formwork and scaffolding sector continues to grapple with payment challenges, especially with the pandemic disrupting all industries.
    As a customer looking to hire modular support, it is better to use caution and choose a company with a reliable credit history. A formwork provider who is caught between payment cycles will be strapped for cash and may fall behind on material upkeep.

  1. Ease of assembly

Formwork systems should be quick and easy to erect and dismantle and have the following attributes:

  • Scalability: Finding a local formwork provider means that, in addition to being able to respond quickly to your need to scale scaffolding or modular formwork up or down, they can also quickly recycle panels, beams, and features.
    Sourcing from a smart provider who has provisions means that vertical formwork products with fewer components than traditional econo-form panels have the added advantage of saving you time and effort on shutter assembly.
  • Customizable solutions: A formwork company needs to be able to identify each projects needs and develop an appropriate solution. You should choose a provider who can customize existing modular structures to suit your specific requirements. Some projects may require a self-climbing system, for example, and your formwork supplier needs to be able to provide such solutions.

  1. Capacity and deliverables

Make sure your formwork supplier has sufficient product and capacity by examining these elements.

  • Resources: It is imperative that your formwork provider has adequate manpower (including labor if required) and the technical expertise to do the job well.
    To determine the most efficient solution for a project, a contractor will evaluate several options to optimize resource utilization. Among the other considerations, the choice of formwork and how it is applied is of prime importance.
  • Network: It also helps if a formwork company has multiple branches across cities, especially near your project sites. This gives you added coverage to ensure the timely supply and wide distribution of products and services.
  • Consumables: If your formwork provider sells a range of handy formwork consumables, like tie cases, slab and wall separators, steel wool, and molding agents, among others, it is an added advantage as they can function as a one-stop-shop for your formwork needs and advice.
  • Timeliness: During the construction process, the concrete formwork has a very central role to play in the construction timelines of the project. A provider who keeps to schedule will be an asset.

ADDITIONAL FORMWORK RECOMMENDATIONS

It goes without saying that you need to source the right kind of materials for specific construction requirements. A professional formwork provider knows these requirements.

Although many formworks have certain commonalities that can be used in most construction situations, in modern times, the design specificity and related mechanical requirements are more demanding on the bearing capacity of concrete buildings, and their shapes.  Therefore, you must be careful to choose an informed provider who has the latest equipment at their disposal.

To guide buyers through the challenge of sourcing technical formwork, we list some products here to help you familiarize yourself with available options.

You may consider asking your provider for more details when it comes to supporting your construction needs.

  • Dokaflex: The Dokaflex is a hand-operated floor formwork system, which consists of only a few components, making it easy and fast to set up.
    The props high load-bearing capacity is complemented by numbered holes for easier height adjustment. With special thread geometry, it is easier to release, even when under a high load. This reduces the users handling time.
  • Framax Xlife: Framax Xlife has been developed to meet the increasing demand for faster and more cost-effective forming by including long-life plywood.
    Due to the plastic coating on the Xlife sheet, the pre-designed panels offer durability and a high number of re-use cycles. Applicable to different wall heights and cross-sections of columns, the panels can be erected quickly and re-used for new applications.
  • Peri GT24: The Peri GT24 is a girder, which is used for slab and wall formwork solutions. The product can be used in systems such as Peris Multiflex, a slab formwork system used for any slab thickness, floor plan, and height, and Vario GT24, a girder wall formwork system with adjustable element connections.
  • ACS climbing bracket: The ACS is a bracket, which climbs smoothly and evenly on climbing rails using hydraulic pumps. It has a lifting power of 100 kilonewtons and raises the unit to the next pour without the need for an intermediate anchor.
  • Mammut 350: This wall formwork system has been on the market since . It incorporates an all-plastic facing, which lasts as long as the frame, never needs to be replaced, and survives an unlimited number of re-uses.
    The Mammut 350 is ideal for civil engineering projects, as well as for industrial and engineering construction. The system can take 100 kilonewtons per meter square of concrete.
  • MEP shoring system: The MEP shoring system can support slab formwork at all heights, from underground carparks to high structures, and is integrated with a safety latch and two prop options for normal and heavy-duty loads in one system.
  • H20 Wall and Column Formwork: With this system, wall and column elements are pre-assembled on-site and are used for all types of shear, core, and single-sided walls.
  • GFT 20 Support Tower: This system incorporates galvanized steel frames. It is mainly used for high and heavy slabs, beams, and bridges.
  • Ulma CC-4: CC-4 is a modular aluminum drop-head panel system used for large areas of flat deck slabs. It is a portable and light slab system that requires no crane. Early striking can be achieved with this product.
    Its main elements are made of aluminum, and it can be erected quickly as its stand-alone grid structure allows one team to set up the grid, whilst another team puts the panels in place.
  • Ulma LGR: Launched in January , the LGR system is an engineer-profiled steel lightweight panel system specially designed for columns and extensively used in villa projects.
    LGR allows for an easy and fast erection because it is portable, and its accessories are fixed to the panel so there are no lost parts. Its formwork surface includes long-lasting plastic (no plywood) and it can withstand pouring pressures of up to 80 kilonewtons per meter square.
  • Ischebeck Titan: The Ischebeck Titans range of legs and props offers fast, effective support for formwork during in-situ and precast casting operations as well as for back-propping of recently cast slabs. Buyers can choose from Titan aluminum legs, push-pull props, steel props, and aluminum props.
  • Ischebeck Noetop: Ischebeck Neotop is a large, high-strength formwork system used for efficient casting of walls in a wide variety of situations. The system sustains concrete pressures up to 88 kilonewtons.

For more information on modular formwork and scaffolding, what would work best for your project, and how you can get the support you need to ensure your construction is safe and efficient, contact the experts at SSF by clicking here.

Economical Column Design (Rule of Thumb) 3

INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Contact US

FIRST NAME

*


LAST NAME

*


*


MESSAGE

*


ADDITIONAL DETAILS

Thanks. We have received your request and will respond promptly.

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!

  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
Join Us!

*Eng-Tips's functionality depends on members receiving . By joining you are opting in to receive .

Posting Guidelines



Students Click Here

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Eng-Tips Posting Policies

Contact US

3

thread507- Forum Search FAQs Links MVPs
  • Forum

  • Search

  • FAQs

  • Links

  • MVPs

Economical Column Design (Rule of Thumb)

Economical Column Design (Rule of Thumb)

struggle67

(Structural)

(OP)

21 Oct 20 08:56

Hi

I am new to columns or any vertical member design. I only know some of the basic theories.

Lets say I am free to choose whatever column size I want. May I know based on your experience, where is the most economical point (NEd, MEd) on the column-interaction diagram? Reinforcement ratio? 2%? And why?

Thanks, and Best Regards,

RE: Economical Column Design (Rule of Thumb)

2

Trenno

(Structural)

21 Oct 20 09:06

Columns with minimum moment:

For Stocky columns 0.5*f'c at Le/r=20
For Slender columns 0.4*f'c at Le/r=35 ; 0.3*f'c at Le/r=45 ; 0.2*f'c at Le/r=60 and 0.05*fc at Le/r=100


Effective Length (Le) = Length * K-fixity factor. Conservative to assume k=1.0.
Radius of Gyration (r) = sqrt (Imin/A) or 0.3*min dimension for rectangular and 0.25*radius for circular.




RE: Economical Column Design (Rule of Thumb)

JLNJ

(Structural)

21 Oct 20 12:59

Like so many simple questions, the answer is complicated.

Given that reinforcement is expensive, choose a column size where the reinforcement needed is the bare minimum. Of course, there are code-required reinforcement and detailing minimums for ductility. The higher your seismicity, the more additional requirements there are

If possible, you want to make your column sizes as uniform as reasonably possible and vary the reinforcement where additional capacity is needed. Consult with local contractors as to which nominal sizes have standard formwork available.

Round columns are probably the most "efficient" for axial-load-dominated columns, but round formwork and spiral ties can be expensive.

One of the biggest gripes from the field is the congestion of the rebar where the girders connect into the columns. A few big bars in the girders and a few big bars in the columns can make rebar placement a nightmare. Or an impossibility. If you sketch the bars to scale you get a sense of whether or not your joint is constructible.

High strength concrete gives you, well, high strength columns. Know what materials are available in your region and specify them appropriately. You can spec different strength concrete for columns than the floor framing, but you better have excellent quality control to make it happen.

I worked on a hospital where the bulk of the columns were 20"x20" with (4) #9 bars. Exactly 1% and just 4 bars in the columns. It doesn't get more efficient than that.

RE: Economical Column Design (Rule of Thumb)

engineering_patrol

(Structural)

21 Oct 20 17:20

Trenno, that's a good explanation thanks man

RE: Economical Column Design (Rule of Thumb)

Agent666

(Structural)

21 Oct 20 17:36

Quote:

I worked on a hospital where the bulk of the columns were 20"x20" with (4) #9 bars. Exactly 1% and just 4 bars in the columns. It doesn't get more efficient than that.


Just be aware most codes would have limits on the spacing of reinforcement on each side of the member and on the minimum number of longitudinal bars (usually more than 4). The rules are there to ensure good ductility and confinement. So make sure you follow all your local rules. Start typically by satisfying all the detailing provisions for your chosen column size and then increase bar size until you satisfy the strength requirements. If you predominantly have flexure in one direction, then varying the bar size first on the compression amd tension faces is obviously more efficient. Having different sized bars in different locations is relatively easy. But too many changes makes the chances of getting something wrong on site more of a prospect.

One thing I've noted in the past is the amount of reinforcing going into the stirrups can be significantly more than you expect, but people concentrate on longitudinal reinforcement only when optimising. Sometimes for heavier columns your confinement reinforcement may be greater than 50% of the total reinforcement by weight. So don't forget to review that.

Just be aware most codes would have limits on the spacing of reinforcement on each side of the member and on the minimum number of longitudinal bars (usually more than 4). The rules are there to ensure good ductility and confinement. So make sure you follow all your local rules. Start typically by satisfying all the detailing provisions for your chosen column size and then increase bar size until you satisfy the strength requirements. If you predominantly have flexure in one direction, then varying the bar size first on the compression amd tension faces is obviously more efficient. Having different sized bars in different locations is relatively easy. But too many changes makes the chances of getting something wrong on site more of a prospect.One thing I've noted in the past is the amount of reinforcing going into the stirrups can be significantly more than you expect, but people concentrate on longitudinal reinforcement only when optimising. Sometimes for heavier columns your confinement reinforcement may be greater than 50% of the total reinforcement by weight. So don't forget to review that.

RE: Economical Column Design (Rule of Thumb)

dik

(Structural)

21 Oct 20 23:45

Quote (Columns with minimum moment:)


Great rule of thumb... been around for 50 years that I know of...

Trenno:Great rule of thumb... been around for 50 years that I know of...

Rather than think climate change and the corona virus as science, think of it as the wrath of God. Feel any better?
-Dik

RE: Economical Column Design (Rule of Thumb)

struggle67

(Structural)

(OP)

22 Oct 20 05:41

Trenno, Thanks That will surely useful for me later on.

I am also curious that in the interaction diagram below is point C considered better / more efficient than points B & D due to this enhanced moment capacity?





Hi Thanks Everyone,Trenno, Thanks That will surely useful for me later on.I am also curious that in the interaction diagram below is point C considered better / more efficient than points B & D due to this enhanced moment capacity?

RE: Economical Column Design (Rule of Thumb)

Lomarandil

(Structural)

22 Oct 20 05:45

Chasing point C (which I believe is what you meant) will usually create false economy if column formworkcolumn formwork sizes change and layout becomes more complicated.

----
just call me Lo.

RE: Economical Column Design (Rule of Thumb)

Trenno

(Structural)

22 Oct 20 06:16

Notice how slenderness effects kick in at Le/r = 20.



I believe forum member IDS produced the following chart (AS).Notice how slenderness effects kick in at Le/r = 20.

RE: Economical Column Design (Rule of Thumb)

KootK

(Structural)

22 Oct 20 15:18

Quote (OP)

I am also curious that in the interaction diagram below is point C considered better / more efficient than points B & D due to this enhanced moment capacity?


Much depends on how you're defining "better" and "more efficient".

1) [C,D,E] are better than [A,B] from an engineering and safety perspective because values below the balanced point [C] will produced a more ductile failure mode not governed by rebar yielding rather than concrete compression failure. This may be of enhanced importance in situations of high seismic demand.

2) [E] is basically a beam rather than a column and in many instances, I would consider that economical and spatially inefficient.

3) In the lower stories of a high-rise building where moments become negligible relative to axial demand in gravity columns, I feel that even being as low as [C] on the graph represents economical and spatial inefficiency.

Like others, I feel that formwork and congestion concerns dominate concrete column economy.

As far as I'm concerned, circular columns are for architects. The circular bar pattern always seems to cause congestion issues for me. If I'm not overly concerned about confinement issues around the outside of a circular column, I'll usually just stuff a square cage in there.

Much depends on how you're defining "better" and "more efficient".1) [C,D,E] are better than [A,B] from an engineering and safety perspective because values below the balanced point [C] will produced a more ductile failure mode not governed by rebar yielding rather than concrete compression failure. This may be of enhanced importance in situations of high seismic demand.2) [E] is basically a beam rather than a column and in many instances, I would consider that economical and spatially inefficient.3) In the lower stories of a high-rise building where moments become negligible relative to axial demand in gravity columns, I feel that even being as low as [C] on the graph represents economical and spatial inefficiency.Like others, I feel that formwork and congestion concerns dominate concrete column economy.As far as I'm concerned, circular columns are for architects. The circular bar pattern always seems to cause congestion issues for me. If I'm not overly concerned about confinement issues around the outside of a circular column, I'll usually just stuff a square cage in there.

RE: Economical Column Design (Rule of Thumb)

hardbutmild

(Structural)

22 Oct 20 16:20

Quote (Trenno)

Columns with minimum moment: For Stocky columns 0.5*f'c at Le/r=20...

Does this mean that the axial capacity of a minimum moment column is 0,5*fc'*column_area for Le/r=20?

Does this mean that the axial capacity of a minimum moment column is 0,5*fc'*column_area for Le/r=20?

RE: Economical Column Design (Rule of Thumb)

KootK

(Structural)

22 Oct 20 16:49

I've got a related question that would fit in well here although it will be kind of an ugly ask.

I have a printout of an amazing concrete concrete design spreadsheet prepared by another firm which I cannot share. It does pretty much an entire high-rise building with detailing, shear stud reinforcing etc. I would not feel comfortable calling them up and asking about the inner working of their intellectual property.

The most interesting part of the spreadsheet, to me at least, is that it seems to deal with preliminary design very handily. There's a bit in the documentation where they basically say "If Mb < 2.5 MPa, don't sweat the reinforcing, something will work. This confirms that the column size will be adequate and the reinforcing can be sorted out later". If you think about the work flow on a typical high-rise concrete building, this is a hugely powerful tool if it's legit. Nobody cares what the rebar is early on but being able to dial in sizes for your architect with minimal effort is a big win. Trouble is: I don't know anything about this 2.5MPa method. The spreadsheet setup suggests that Mb = Moment / Section modulus. That makes sense to me but why 2.5MPa should be a reasonable limit is not apparent to me.

Anybody know anything about this method? Maybe it comes from some ancient text book or ACI paper I don't know of? Part of what may make this difficult to parse out is that the 2.5MPa is in metric units and may well be a modified version of something else that would have been expressed in imperial units that would probably be easier to identify.

RE: Economical Column Design (Rule of Thumb)

dik

(Structural)

22 Oct 20 17:10

You want to keep the same column size for 3 or 4 floors, and not change each floor, or keep the same size.

Rather than think climate change and the corona virus as science, think of it as the wrath of God. Feel any better?
-Dik

RE: Economical Column Design (Rule of Thumb)

Agent666

(Structural)

22 Oct 20 17:20

I'd say it just results in an infinitesimally small moment.

For example for a 600 x 600 column the 2.5MPa limit calcs out to a moment of 90kNm. Minimum steel would probably net you several times this, and if subject to any seismic loads or gravity loads with any sort of reasonable beam span 90kNm would be quickly exceeded.

I'm not aware of anything formally noting this type of thing. But it sounds more like a best practice/experience limit they have found?

RE: Economical Column Design (Rule of Thumb)

jayrod12

(Structural)

22 Oct 20 17:21

I feel that the 2.5MPa makes a lot of sense when you actually think about it and compare it to Trenno's guidance. That's likely going to be pretty close to 0.1fc' for moderately slender columns and if you end up with a highly slender column, you go up to 50 or 60 MPa and then you're at the 0.05fc' intent.

RE: Economical Column Design (Rule of Thumb)

KootK

(Structural)

22 Oct 20 17:25

Quote (Agent666)

But it sounds more like a best practice/experience limit they have found?


Thanks Agent, you may well be right about that.

Thanks Agent, you may well be right about that.

RE: Economical Column Design (Rule of Thumb)

hardbutmild

(Structural)

22 Oct 20 17:28

Quote (KootK)

If Mb < 2.5 MPa, don't sweat the reinforcing

For rectangular columns:
M/(bh2/6) = 2,5 MPa
M/(bh2) = 2,5/6

Since non-dimensional moment mi = M/(bh2fc)
M/(bh2) = mi*fc

mi*fc = 5/12

If concrete of 30 MPa is used (around 4 ksi) and partial factor of safety is 1,5 (design strength is 20 MPa):
mi < 0,02

Isn't this very low (for higher concrete strengths, this moment is even lower)? Looking at an interaction (Moment - axial force) diagram, this seems like an area with less than minimum reinforcement.

Or did I miscalculate something?

For rectangular columns:M/(bh/6) = 2,5 MPaM/(bh) = 2,5/6Since non-dimensional moment mi = M/(bhfc)M/(bh) = mi*fcmi*fc = 5/12If concrete of 30 MPa is used (around 4 ksi) and partial factor of safety is 1,5 (design strength is 20 MPa):mi < 0,02Isn't this very low (for higher concrete strengths, this moment is even lower)? Looking at an interaction (Moment - axial force) diagram, this seems like an area with less than minimum reinforcement.Or did I miscalculate something?

RE: Economical Column Design (Rule of Thumb)

KootK

(Structural)

22 Oct 20 17:28

Quote (jayrod12)

...and if you end up with a highly slender column...


Thanks for your contribution. The documentation does, in fact, start off by saying that most of the columns in their typical building will wind up being slender. You know the drill in the residential towers: 300x, 250x, 200x. The dreaded slender wallumn that will persist until explicitly prohibited.

Thanks for your contribution. The documentation does, in fact, start off by saying that most of the columns in their typical building will wind up being slender. You know the drill in the residential towers: 300x, 250x, 200x. The dreaded slender wallumn that will persist until explicitly prohibited.

RE: Economical Column Design (Rule of Thumb)

KootK

(Structural)

22 Oct 20 17:30

Quote (hardbutmild)

Isn't this very low (for higher concrete strengths, this moment is even lower)?


It is. To be honest, the setup is opaque enough to me that I may well be missing a 12 x multiplication somewhere or something. So I'd like to not get too caught up on the particular values. I'm really just interested to know if there are any good sizing methods out there that do account for significant moments and slenderness. This is the first that I've seen. And it may well be that it's just hugely conservative. Based on the work to which this setup would typically be applied, the moments would generally be quite small relative to the axial demand as they would be mostly just slab moments modelled with very liberal estimates of column stiffness.

It is. To be honest, the setup is opaque enough to me that I may well be missing a 12 x multiplication somewhere or something. So I'd like to not get too caught up on the particular values. I'm really just interested to know if there are any good sizing methods out there that do account for significant moments and slenderness. This is the first that I've seen. And it may well be that it's just hugely conservative. Based on the work to which this setup would typically be applied, the moments would generally be quite small relative to the axial demand as they would be mostly just slab moments modelled with very liberal estimates of column stiffness.

[Post Deleted]

RE: Economical Column Design (Rule of Thumb)

Settingsun

(Structural)

22 Oct 20 20:43

Maybe the 2.5 MPa is an approximation to flexural tensile strength and therefore minimum bending strength. 2.5 MPa = 0.6 * sqrt( psi).

RE: Economical Column Design (Rule of Thumb)

Lomarandil

(Structural)

23 Oct 20 06:23

That was my first thought too Steve, but I don't think your conversion works.

----
just call me Lo.

RE: Economical Column Design (Rule of Thumb)

Settingsun

(Structural)

23 Oct 20 06:53

0.6 *sqrt(f'c) is for metric units, so you convert psi to 17.2MPa before running the calc.

RE: Economical Column Design (Rule of Thumb)

Lomarandil

(Structural)

23 Oct 20 09:45

Ah, right you are!

----
just call me Lo.

RE: Economical Column Design (Rule of Thumb)

Celt83

(Structural)

23 Oct 20 13:13
Pu = PhiPn,max = 0.85*0.65*((0.85*F'c*(Ag-Ast))+(Fy*Ast))

substitute Ag = b*h and Ast = (1/100)*b*h

Determine a M,min as (0.6+0.03*h)*Pu

Then the max ratio of Secondary to First order moments is 1.4, so M = M,min/1.4

divide both sides by s = b*h*h / 6

From here I plugged in Fy = 60,000 psi, F'c = [,,,] and h = [12,18,24,36]

This results in PSI values so I divided by 145 to get Mpa. The 24 and 36 h at the lower F'c comes in near 2.5



Steveh49 likely has it, but I found some fun new math software so took it for a spin.

My Personal Open Source Structural Applications:
https://github.com/buddyd16/Structural-Engineering

Open Source Structural GitHub Group:
https://github.com/open-struct-engineer

I looked at taking:Pu = PhiPn,max = 0.85*0.65*((0.85*F'c*(Ag-Ast))+(Fy*Ast))substitute Ag = b*h and Ast = (1/100)*b*hDetermine a M,min as (0.6+0.03*h)*PuThen the max ratio of Secondary to First order moments is 1.4, so M = M,min/1.4divide both sides by s = b*h*h / 6From here I plugged in Fy = 60,000 psi, F'c = [,,,] and h = [12,18,24,36]This results in PSI values so I divided by 145 to get Mpa. The 24 and 36 h at the lower F'c comes in near 2.5Steveh49 likely has it, but I found some fun new math software so took it for a spin.My Personal Open Source Structural Applications:Open Source Structural GitHub Group:

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.


Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members! Already a Member? Login



News


5 things you need to know when choosing your formwork ...

News

Summary

Whether its better for a company to rent or purchase formwork items and systems depends on the kind of project under development and the time it will take to complete. Either way, the supplies needed must be of high quality and durability to ensure the timely, accident-free completion of the work. This means that your formwork provider should be a professional who has the requisite capacity to meet a projects needs, as well as the technical know-how to customize options and deliver.

Therefore, it is advisable that you watch out for suppliers with a limited product range. Often they will cut prices on standard-forming jobs but will have to quit when it comes to the more challenging part where know-how is needed. By contrast, a more experienced provider with an extensive range can supply custom-made forms.

Ultimately, it pays to only buy or rent from established companies with extensive experience. Ensure that the company you select offers professional and on-time design, with the technical capabilities to provide support to your engineering teams. You should be wary of formwork companies that offer discounted rates as they tend to use counterfeit products. Moreover, they do not maintain equipment to the best standards. This fails to provide the safety and peace of mind that you need to ensure quality work on your project.

In this report, we highlight what you should look out for when choosing a formwork provider for your construction needs.

INDEX

ADDITIONAL FORMWORK RECOMMENDATIONS

5 THINGS YOU NEED TO KNOW WHEN CHOOSING YOUR FORMWORK PROVIDER

When it comes to choosing your formwork provider, you cannot afford to make your decision too quickly. There are specific things that you need to look for when purchasing or hiring formwork systems. The correct formwork can make a construction project a success, whereas using the wrong systems can literally bring down a building.

Formwork makes up about 1.2% of the total costs of a buildings structural work. But you would be incorrect in thinking the role it plays is simple and insignificant. In fact, choosing good quality from a reliable provider is one of the most important decisions youll make for your project.

Here are five things you need to look for when selecting a formwork provider for your next construction project.

  1. Safety and quality

It goes without saying that safety and quality are of the utmost importance with any type of formwork or scaffolding. Thats why you should look for a provider who is committed to the following:

  • Meets certification: Devastating accidents can happen when forms are removed too soon before the building material has set. Equally, poor and under-designed formwork can bend or even break during the filling process because it does not meet certification.
    Make sure your supplier and their products meet the necessary safety standards set by your country or region for construction work and products. It pays to familiarize yourself with the certificates required, and cross-check if your formwork provider has them.
  • Cares about quality: You must consider your providers product in the decision-making process.
    For example, steel-framed wall formwork with standard plywood facing requires more maintenance and repair than a hot-dipped galvanized steel frame that uses specially manufactured plywood designed for longer life.
  • Meets maintenance standards: Before deciding on your formwork provider, you need to ensure that they thoroughly inspect and test their hire equipment to guarantee the strength and quality of each piece.
    You will be surprised to find out that not many companies invest in the meticulous upkeep and maintenance of their hire equipment.
  • Does not use counterfeit materials: The use of counterfeit products is a major cause of accidents on project sites. Thats why its important to know the difference between a genuine product that can bear your required workload.
    Sourcing from an inexperienced or questionable formwork provider means that you may receive a faulty product, which can have dangerous consequences. It helps to know that the Middle East is a major market for counterfeit products due to the high number of imports and exports in the region.One way you can identify counterfeit formwork products is if the discount is too good to be true. Products certified by the manufacturer will not be available at steep discounts, whereas counterfeit items, which use inferior materials, can offer a lower price point, but it comes with the potential for catastrophic consequences.
  • Enjoys good industry reputation: A formwork provider who has repeat business and customer recommendations will also have a market reputation for safety and quality.

  1. Value for money

The simple truth is that quality formwork systems do not have to be exorbitantly expensive. In designing and building formwork, you should aim for maximum economy, which you can do by focusing on the following points:

  • Clever design can contribute greatly to the overall costs. Find a form provider who can offer expert engineering and technical support to projects of all shapes and sizes.
    The formwork should be well-priced, with systems that are durable, reusable, and quick to erect. Well-engineered formwork will give your project enhanced productivity whilst reducing expense.
  • Your formwork provider should offer updated systems to help you reduce, or ideally altogether remove, the need for conventional formwork like timber and plywood.
    More old-fashioned kinds of formwork have more wastage and are typically designed as single-use.  Using a modern, more up-to-date system is better for your projects bottom-line and the environment.
  • Be wary of huge price differentials. Expanding on the point above, as a buyer you need to be conscious of how products should be priced so that you can understand when you are getting a cost-effective solution versus a suspect, possibly counterfeit, product.
    If the product is more than 20% cheaper than other systems, that should raise some red flags. More likely than not, heavily discounted products are counterfeit and could be ineffective, or possibly dangerous.

  1. Experience

Look for someone with proven formwork experience across a variety of sectors. The following factors will help you determine if a possible provider has the experience you need for your project.

  • Market reputation: Reputations are built through repeat success, over several different kinds of projects.
    Not all projects are the same, and you want a provider with a commitment to service excellence and a can-do approach, no matter the type of project.
  • Low accident rate: Whilst it may not be possible to find a formwork provider with absolutely no accidents in their entire history, you should look for someone with the least number of incidents.
    Ensure that the formwork they provide is strong and well-maintained and can work across all weathers especially bear the expansion and contraction that comes from extreme heat and cold.
  • Local industry familiarity: Sourcing someone who has worked in the local market means that they are familiar with the nuances of climate constraints, logistics support, as well as local workforce idiosyncrasies. It also gives them the added advantage of responding quickly and with flexibility.
  • Credit history: Its an industry fact that the formwork and scaffolding sector continues to grapple with payment challenges, especially with the pandemic disrupting all industries.
    As a customer looking to hire modular support, it is better to use caution and choose a company with a reliable credit history. A formwork provider who is caught between payment cycles will be strapped for cash and may fall behind on material upkeep.

  1. Ease of assembly

Formwork systems should be quick and easy to erect and dismantle and have the following attributes:

  • Scalability: Finding a local formwork provider means that, in addition to being able to respond quickly to your need to scale scaffolding or modular formwork up or down, they can also quickly recycle panels, beams, and features.
    Sourcing from a smart provider who has provisions means that vertical formwork products with fewer components than traditional econo-form panels have the added advantage of saving you time and effort on shutter assembly.
  • Customizable solutions: A formwork company needs to be able to identify each projects needs and develop an appropriate solution. You should choose a provider who can customize existing modular structures to suit your specific requirements. Some projects may require a self-climbing system, for example, and your formwork supplier needs to be able to provide such solutions.

  1. Capacity and deliverables

Make sure your formwork supplier has sufficient product and capacity by examining these elements.

  • Resources: It is imperative that your formwork provider has adequate manpower (including labor if required) and the technical expertise to do the job well.
    To determine the most efficient solution for a project, a contractor will evaluate several options to optimize resource utilization. Among the other considerations, the choice of formwork and how it is applied is of prime importance.
  • Network: It also helps if a formwork company has multiple branches across cities, especially near your project sites. This gives you added coverage to ensure the timely supply and wide distribution of products and services.
  • Consumables: If your formwork provider sells a range of handy formwork consumables, like tie cases, slab and wall separators, steel wool, and molding agents, among others, it is an added advantage as they can function as a one-stop-shop for your formwork needs and advice.
  • Timeliness: During the construction process, the concrete formwork has a very central role to play in the construction timelines of the project. A provider who keeps to schedule will be an asset.

ADDITIONAL FORMWORK RECOMMENDATIONS

It goes without saying that you need to source the right kind of materials for specific construction requirements. A professional formwork provider knows these requirements.

Although many formworks have certain commonalities that can be used in most construction situations, in modern times, the design specificity and related mechanical requirements are more demanding on the bearing capacity of concrete buildings, and their shapes.  Therefore, you must be careful to choose an informed provider who has the latest equipment at their disposal.

To guide buyers through the challenge of sourcing technical formwork, we list some products here to help you familiarize yourself with available options.

You may consider asking your provider for more details when it comes to supporting your construction needs.

  • Dokaflex: The Dokaflex is a hand-operated floor formwork system, which consists of only a few components, making it easy and fast to set up.
    The props high load-bearing capacity is complemented by numbered holes for easier height adjustment. With special thread geometry, it is easier to release, even when under a high load. This reduces the users handling time.
  • Framax Xlife: Framax Xlife has been developed to meet the increasing demand for faster and more cost-effective forming by including long-life plywood.
    Due to the plastic coating on the Xlife sheet, the pre-designed panels offer durability and a high number of re-use cycles. Applicable to different wall heights and cross-sections of columns, the panels can be erected quickly and re-used for new applications.
  • Peri GT24: The Peri GT24 is a girder, which is used for slab and wall formwork solutions. The product can be used in systems such as Peris Multiflex, a slab formwork system used for any slab thickness, floor plan, and height, and Vario GT24, a girder wall formwork system with adjustable element connections.
  • ACS climbing bracket: The ACS is a bracket, which climbs smoothly and evenly on climbing rails using hydraulic pumps. It has a lifting power of 100 kilonewtons and raises the unit to the next pour without the need for an intermediate anchor.
  • Mammut 350: This wall formwork system has been on the market since . It incorporates an all-plastic facing, which lasts as long as the frame, never needs to be replaced, and survives an unlimited number of re-uses.
    The Mammut 350 is ideal for civil engineering projects, as well as for industrial and engineering construction. The system can take 100 kilonewtons per meter square of concrete.
  • MEP shoring system: The MEP shoring system can support slab formwork at all heights, from underground carparks to high structures, and is integrated with a safety latch and two prop options for normal and heavy-duty loads in one system.
  • H20 Wall and Column Formwork: With this system, wall and column elements are pre-assembled on-site and are used for all types of shear, core, and single-sided walls.
  • GFT 20 Support Tower: This system incorporates galvanized steel frames. It is mainly used for high and heavy slabs, beams, and bridges.
  • Ulma CC-4: CC-4 is a modular aluminum drop-head panel system used for large areas of flat deck slabs. It is a portable and light slab system that requires no crane. Early striking can be achieved with this product.
    Its main elements are made of aluminum, and it can be erected quickly as its stand-alone grid structure allows one team to set up the grid, whilst another team puts the panels in place.
  • Ulma LGR: Launched in January , the LGR system is an engineer-profiled steel lightweight panel system specially designed for columns and extensively used in villa projects.
    LGR allows for an easy and fast erection because it is portable, and its accessories are fixed to the panel so there are no lost parts. Its formwork surface includes long-lasting plastic (no plywood) and it can withstand pouring pressures of up to 80 kilonewtons per meter square.
  • Ischebeck Titan: The Ischebeck Titans range of legs and props offers fast, effective support for formwork during in-situ and precast casting operations as well as for back-propping of recently cast slabs. Buyers can choose from Titan aluminum legs, push-pull props, steel props, and aluminum props.
  • Ischebeck Noetop: Ischebeck Neotop is a large, high-strength formwork system used for efficient casting of walls in a wide variety of situations. The system sustains concrete pressures up to 88 kilonewtons.

For more information on modular formwork and scaffolding, what would work best for your project, and how you can get the support you need to ensure your construction is safe and efficient, contact the experts at SSF by clicking here.