It sounds like you have identified one of your problems. Conveyor has too much load.

This will cause stability problems if that is the case then you defiantly need a second drive.
One way to tell is to look at the motor load a good reference point is a normal load should be 75% of full load. This will give you a buffer for those times when the load increases. If the load is above that then you need a second drive. I know you said that that is not possible I think you really mean that it is not in the budget but sometimes you have to find it in the budget. I don’t like to use those terms not possible, about the only thing that is not possible is me walking on the moon in my life time.
You said you have an encoder connected to the main line chain through as series of blocks or sprokets to monitor the line speed. I hope you are not using that for the speed feedback loop to the drive. If so that is the worst configuration you can have you will ever get it to be stable that way. If you using this arrangement just to monitor the line speed then you could actually be running very stable but the monitor encoder is just showing the instability in the chain and sprockets a better place to get the line speed would be from the motor or even just the use the signal from the drive.

For feed back to the drive the encoder should be mounted on the motor this will give you more pulses to work with, better resolution = better speed control.
As I have said before the best way to connect the second drive on a common chain conveyor is to connect the second or slave drives in torque follower arrangement this also has the advantage that the drives don’t have to be the same size (HP) you can add just what you need to handle the extra load. Each drive will supply the same proportional torque for the drive and speed will always match.
Example a 50HP and 20HP powering the same chain conveyor the master controls the speed. Sa the torque on the master goes up the torque from the slave will go up so at 50% torque both drive will be supplying 50% of their rated torque.
I hope that helps

For more information, please visit Golden Jash.

Are you interested in learning more about Speed Conveyor Chain? Contact us today to secure an expert consultation!

Roller chain and sprocket rpm?

go with a double reduction with the first reduction using the smallest drive sprocket you can get that has an odd number of teeth.

this will keep the sprocket sizes down to manageable sizes and keep tooth contact within reason.

do it up in a welded steel case and add some oil, then off you go.

i have seen 350 chevy engines with dual roller cams run well over 300k miles and the chains still look pretty good.

so maybe you use a chevy cam and crank gear as the first reduction, and follow that with the needed reduction in single row #50 for the final drive?

the chevy cam drive is not running in a pool of oil, it is just what leaks out past the cam bushing and the front main brg, and is thrown around inside the case.

also if you try to do it in a single reduction, you ought to provide for some sort of auto/spring loaded tensioner, if for no other reason but to keep the chain whip under control. there will likely be issues if you don't, so plan for inclusion of some sort of tensioner before hand when it is easier to incorporate rather than later.

another viable option would be either a cog belt (probably a better solution) or a microgroove/serpentine type belt (not as good as a cog drive but better than a chaindrive in my opinion,, neither would require lube but both would benefit or require a tensioner.

fwiw

bob g