I know we've beaten this topic to death but I thought I might revisit it one more time. The questions that are still nagging are:

1.) Best placement of the mesh in the slab, centered, 2 in. from top, or stomped on by construction workers until it is in the bottom.
2.) Should the mesh size extend to the perimeter of the slab? Ground clearance from edge and from bottom? If its a 4" slab isn't the 3" rule for reinforcement violated?
3.) Most typical mesh size I've seen is 6x6-W2.9xW2.9 but I've also seen 6x6-W1.4xW1.4, any thoughts on what mesh size is best for a typical 4" and 6" slab (residential work).
4.) I've seen dobie blocks and wire chairs used to keep up slab bars, what should be used for mesh? Won't the workers step on the mesh and bend it out of shape or push it to the bottom?
5.) #3 Bar, Mesh, or Fiber? What do you use and why?

For reference the image below shows a typical or proposed SOG with mesh reinforcement.



A confused student is a good student.
Nathaniel P. Wilkerson, PE
My opinion, presently:

medeek said: 1.) Best placement of the mesh in the slab, centered, 2 in. from top, or stomped on by construction workers until it is in the bottom.

If it's a residential, 4" slab I put the mesh at mid-depth. If you're going to dodge the saw-cuts and get a modicum of cover, putting it in the upper third as some recommend is pretty tough. As I see it, the placement comes down to two issues as far as cracking goes. Firstly, the reinforcement helps with axial strains and cracking across the slab. For this purpose, position isn't all that important and mid-depth makes sense. Secondly, the reinforcement helps with flexural strain and cracking at the top of the slab where local hard spots may result in hogging moments. I say to heck with latter. In a 4" slab with saw-cuts, I doubt you'll ever get the reinforcing high enough in the section to be effective flexural reinforcement.

medeek said: 2.) Should the mesh size extend to the perimeter of the slab? Ground clearance from edge and from bottom? If its a 4" slab isn't the 3" rule for reinforcement violated?

I'd extend it to the perimeter or at least the last saw-cut joint if there is one near the perimeter. Cover is routinely violated in thin slabs on grade, both on the ground side and below the saw-cut joints. That's what's done and, at least for common interior applications, reinforcement rusting doesn't seem to come to pass or cause any problems. Slab on grade is, technically, not structural concrete.

medeek said: 3.) Most typical mesh size I've seen is 6x6-W2.9xW2.9 but I've also seen 6x6-W1.4xW1.4, any thoughts on what mesh size is best for a typical 4" and 6" slab (residential work).

I've been using W1.4 for thing residential slabs. Frankly, I consider the reinforcing in these slabs to pretty much just be nominal rather than seriously purposeful. Where I'm doing non-calculated token detailing, I lean towards light.

medeek said: 4.) I've seen dobie blocks and wire chairs used to keep up slab bars, what should be used for mesh? Won't the workers step on the mesh and bend it out of shape or push it to the bottom?

This. And yeah, it's a perpetual QC problem that routinely causes engineers to doubt the use of WWF for anything important.

medeek said: 5.) #3 Bar, Mesh, or Fiber? What do you use and why?

I like bars, fibers, or nothing from a performance/QC perspective as long as jointing is done properly. In my area it's almost always wire mesh because that's what contractors continue to prefer and expect.

I like to debate structural engineering theory -- a lot. If I challenge you on something, know that I'm doing so because I respect your opinion enough to either change it or adopt it. If you are looking to get flexural reinforcement ratios for a 4" S.O.G., then good luck - especially with wire mesh. All we ever use mesh for in the South is for typical T&S steel. If you truly need flexural capacity, then use bars. If you do though, move up to a 6"-thick slab: its more practical, more workable, and more forgiving of slight reinforcement depth displacement. Space the bars at 16" o.c., so workmen can walk without stepping on the bars. And never, ever, let the workmen "hook and lift" ANY reinforcing - ever. As KootK suggested, if you want to keep the 4" slab thickness, opt for fiber reinforcing instead - it more than pays for itself in saved labor, and headaches about big shrinkage cracks forming because the wire was lying on the ground at the bottom of the slab, and working to exacerbate the cracking. The old joke around here is to use a "standard #6 slab": 6"-thick, #6 wire mesh, with 6" x 6" spacing. ;-)
Dave

Thaidavid

Heavy Equipment Concrete Slab Design Essentials

A required part of this site couldn’t load. This may be due to a browser extension, network issues, or browser settings. Please check your connection, disable any ad blockers, or try using a different browser.

For more information, please visit Slab Mesh Factory.

Want more information on Rebar Welded Wire Mesh? Feel free to contact us.

Heyou Product Page