8:Analysis of Difficulties in Installation of Crane Beam System
During the construction of the steel structure workshop, the installation of the crane beam must be carried out from the support span between the columns in strict accordance with the specification. After the support installation and connection between the columns has formed a relatively stable spatial rigidity unit, the installation from here is to ensure safety and It can ensure that the crane beam installation will not affect the verticality of the column. At the same time, during the installation process, the bottom of the crane beam with large end section error should be equipped with an adjustment pad. The pad should be welded and fixed after the crane beam system is adjusted. Accurately align the positioning line measured and placed in advance. The connection of the braking system should be formally connected after the crane beam is adjusted and fixed. When the brake plate is connected with the high-strength bolt of the crane beam and the auxiliary truss is welded, in order to prevent the continuous welding from affecting the high-strength bolt, the high-strength bolt of the brake plate and the crane beam should be connected first, and the initial tightening, and then adjust the auxiliary The truss, and after the spot welding of the brake plate, finally tighten the high-strength bolts, and finally weld the brake plate and the auxiliary truss. The tightening of high-strength bolts and the welding of brake plates should be carried out from the middle of each plate to both sides to reduce the internal stress of the plate.
9:On the problem of yard placement of steel structure members
In order to facilitate the installation of steel structure components, the components should be stacked reasonably after entering the factory. The principle is: those that are urgently needed to be installed on the site should be stacked directly on the site, and the codes that are first hoisted in accordance with the lifting order are placed on the top, and the codes that are hoisted are placed on the bottom. The hoisted components are temporarily stored outside the site. When stacking, please pay attention to the separation of the columns and beams and put them according to the axis classification code. The storage site should be managed by a special person, and the inventory and data should be inventoried according to the supply requirements and the supply list. The components should be placed upright and not horizontally. The support point of each component should not be less than two. The location of the support point should be at one-seventh of the end of the component. When stacked, it should not exceed three layers and use the correct layering pad of the wooden side. Good leveling, the fulcrum should be aligned up and down.
Architectural steel structure engineering technology is a new technology that has emerged in recent years. In modern society, steel structure is already one of the main building materials, which has a great role in various fields. Steel structure technology has many advantages and Compared with other building materials, the steel structure has the advantages of high strength, good seismic resistance, short construction period, and recycled scrap. It has been widely used in the construction of No. 1 large and medium-sized workers in China in recent years, showing good development prospects. To help design, construction, and supervision personnel grasp the new specifications, standards, and technologies of building steel structures as soon as possible.
Are you interested in learning more about hot dipped galvanized coil for door panels, hot dipped galvanized coil for conditioning systems, PPGI Coil For Household Appliances? Contact us today to secure an expert consultation!