Whether you’re building a concrete patio or a skyscraper, you’re going to need concrete forms to get the job done. Without concrete forms, your concrete won’t hold its shape and will be at risk of cracking and losing its strength. Concrete forms go hand-in-hand with other concrete placing techniques to ensure your concrete remains strong and durable. So to guarantee your concrete construction projects go smoothly, order enough concrete products for the job and make sure you use concrete forms.
Keep on reading and learn how to use formwork, the principles behind it, and why it is so helpful on the job site.
Formwork, also known as concrete forms, is a temporary or permanent mould used to create concrete slabs and structures. It’s a barrier that holds the fresh concrete in place and helps with shaping the concrete until the concrete is strong enough to hold its own weight and shape.
To work effectively at supporting the concrete’s weight and shape, concrete forms must:
Formwork is usually made from timber and plywood. But it can also be made from other materials, such as metals, ceramic, or glass fibre reinforced plastics.
Plywood formwork is also called shuttering. Shuttering is the most popular type of formwork and is created on-site using water-resistant plywood and timber.
When on the job site, concrete contractors will erect plywood, steel, or aluminium formwork to create the moulds of concrete slabs, walls, and other structures.
Concrete formwork includes the following components:
The formwork that comes in direct contact with concrete is called the formwork sheeting, or the formwork shell. This sheeting will mould the shape of the concrete and have the most influence on the finished concrete surface.
The formwork bearers, which are usually made of timber or steel beams and clamps, support the formwork sheeting. These distribute the concrete forces through the falsework, supporting structures, formwork ties, and soil.
Formwork ties are usually made of steel wire and are used to tie two formwork faces together to support horizontal pressure from vertical formwork.
The steel wire is slung around the formwork bearers, guided through boreholes in the formwork sheeting, and tightened by twisting the wire.
Once the formwork is constructed, concrete contractors will place rebar inside the formwork to reinforce the concrete.
Next, contractors will pour concrete inside the forms. Once the concrete hardens, they will remove (strip) the forms from the concrete structure if using temporary formwork.
To prevent damage to the concrete and difficulties when removing formwork, it’s important to consider the placement of formwork and the sequence in which the framework will be stripped.
Avoid using too many nails and supports (falsework) when building formwork, as this will be too difficult to strip later on. Only use as much as necessary to maintain the support of the formwork.
Temporary concrete forms should be left to support the concrete until the concrete has thoroughly dried and reached an ideal strength to support its shape. This usually takes about two days after pouring the concrete.
If you remove the formwork too soon, the concrete might begin to sag, crack, and collapse. Remember to be patient and let your concrete thoroughly dry before removing formwork.
Formwork is used for holding the shape of concrete while it dries. It is commonly used for building concrete for:
The type of formwork you use will depend on your project needs. A simple temporary plywood formwork, such as plank shuttering, is suitable for moulding concrete paths and driveways.
But if you’re building a concrete foundation for a home, you will want to use more sophisticated formwork, such as permanent insulated concrete forms.
Unlike traditional concrete forms, insulating concrete forms (ICF) are not removed once the concrete hardens. Instead, ICFs remain as permanent parts of the concrete structure.
While concrete creates the structure, the ICFs insulate the structure. Homes and buildings with ICF foundations are soundproof, airtight, and comfortable in all seasons. This insulation helps homeowners save on energy costs for heating and cooling throughout the year.
ICFs are often made from a combination of insulating materials, such as plastic foam beads and cement, or wood fibre and cement.
Another popular material for ICFs is expanded or extruded polystyrene. Expanded polystyrene is made by expanding plastic beads in a mould, similar to Styrofoam coffee cups.
Extruded polystyrene is made by expanding plastic resin and extruding through a die, similar to meat trays from grocery stores.
ICFs typically come in blocks or planks. ICF block systems are pre-formed with foam and metal or plastic ties. They are ready to stack and interlock when they arrive on site.
Plank ICFs are individual panels or planks of foam requiring assembly on site with ties.
Block ICFs save you time and labour costs, while plank ICFs save on shipping costs since they are more compact to ship.
These concrete forms usually provide at least two inches of insulation on both sides of a concrete wall.
ICFs are not only faster to place, but they also provide significantly better insulation compared to wood or steel frames. So if you’re planning to build a new home, consider using ICFs for a well-insulated foundation.
Formwork is necessary when there is no soil or other structural components to support freshly poured concrete and hold it in the desired shape.
Formwork is necessary for the construction of concrete and reinforced concrete structures, such as:
Vertical formwork is necessary for building concrete foundations, walls, and columns. Tie wires or tie rods are also used with this formwork to support the lateral pressure of concrete.
Vertical formwork must also be anchored to the subsoil to prevent lifting from buoyant forces in the concrete.
Horizontal formwork is necessary for constructing concrete ceilings and beams. This formwork must be supported against vertical and horizontal loads, using formwork load-bearers and columns, braces and struts, or a rigid connection to existing structures, such as walls and columns.
Concrete forms are an essential part of building sound concrete structures. When constructed correctly, formwork moulds concrete into the desired shape and supports the weight of concrete while it’s drying.
And most importantly, concrete forms allow concrete to reach its optimal strength and durability without sagging or cracking.
Unlike traditional formwork, engineered formwork is made of metal. They are prefabricated, not built on-site as the conventional ones. Engineered formwork consists of steel or aluminium, and since it is prefabricated using a more durable material, this option is often more cost-efficient and can be reused – up to 3 000 times! It is also more durable and reliable since a change in environment or temperature will not change its performance. Since you don’t have to spend time on setting up like the conventional ones, it makes the whole process faster, too.
It is clear that concrete forms are necessary for ensuring the concrete setting properly during a construction project, whatever the size of it. Even though timber is usually used for maintaining the form of concrete, there are different materials and types of formwork that can be used. However, prefabricated formwork is more useful for contractors, but you can easily sell them after finishing the project. A.L. Blair can help you with any project you have in mind, so don’t hesitate to reach out.
End view of typical preassembled flat wall ICF block
Insulating concrete forms (ICFs) result in cast-in-place concrete walls that are sandwiched between two layers of insulation material. These systems are strong and energy efficient. Common applications for this method of construction are low-rise buildings, with property uses ranging from residential to commercial to industrial. Traditional finishes are applied to interior and exterior faces, so the buildings look similar to typical construction, although the walls are usually thicker.
Thirty-foot tall ICF walls for multi-screen theatre project in Utah.
Insulating concrete forms, or ICFs, are forms used to hold fresh concrete that remain in place permanently to provide insulation for the structure they enclose. Their history dates back to after World War II, when blocks of treated wood fibers held together by cement were used in Switzerland. In the 1940s and 1950s, chemical companies developed plastic foams, which by the 1960s allowed a Canadian inventor to develop a foam block that resembles today’s typical ICFs. Europeans were developing similar products around the same time.In the 1980s and 1990s, some American companies got involved in the technology, manufacturing blocks and panels or planks. By the mid-1990s, the Insulating Concrete Form Association (ICFA) was founded to do research and promotion of the products, working toward building code acceptance. They also worked with the Portland Cement Association to build awareness of this type of construction. Although there were some obstacles—costs could be greater than frame construction because people didn’t understand the system, builders had to work closely to get code approval, and materials were proprietary—the number of insulating concrete forms producers grew. As a result, competition increased and costs moderated.The new companies developed variations and innovations to distinguish one system from another. Over time, some ICF manufacturers consolidated, leading to a smaller number of larger companies. Because insulating concrete forms systems offered performance benefits like strength and energy efficiency and were initially more expensive to construct, the first target market was high end home construction. Custom home clients were willing and able to pay extra for the premium quality. As word of ICFs grew and innovations reduced manufacturing and installation costs, builders began using the forms for mid-price-range homes. Some production builders now create entire large developments using insulating concrete forms.In the past, single family residential accounted for about 70 percent of ICF construction—versus about 30 percent for commercial or multifamily uses—but the products are suitable for all these applications, and larger buildings appear to be a growing market for ICFs. They have become popular for a variety of commercial projects including apartments or condos, hotel/motel, retail, and even movie theaters.
Insulating concrete forms provide benefits to builders and building owners alike.
Owners appreciate:
Contractors and builders like:
Insulating concrete forms systems can vary in their design. "Flat" systems yield a continuous thickness of concrete, like a conventionally poured wall. The wall produced by "grid" systems has a waffle pattern where the concrete is thicker at some points than others. "Post and beam" systems have just that – discrete horizontal and vertical columns of concrete that are completely encapsulated in foam insulation. Whatever their differences, all major ICF systems are engineer-designed, code-accepted, and field-proven.
The two insulating faces are separated by some type of connector or web. Large preassembled blocks stack quickly on site. Panels or planks ship more compactly, but must be assembled into formwork on the job. Foam is most often expanded polystyrene (EPS). It can be extruded polystyrene (XPS), which is stronger, but also more costly. A few products are made with recycled foam or wood fiber in a nod to green construction. The salvaged material is formed into blocks with cement, making units ideal for direct application of plaster finishes.
The ties that interconnect the two layers of insulated forming material can be plastic, metal, or additional projections of the insulation. There are advantages to each type of material, but one current trend incorporates hinges into the ties that allow pre assembled forms to fold flat for easy, less costly shipping.
The joints between individual forms can feature interlocking teeth or a tongue and groove configuration molded into the forming material, or simple butt jointed seams. Many manufacturers have developed units with universal interlocks that allow the forms to stack whether the form is flipped one way or the other. These “reversible” forms save time during placement and prevent improper alignment. Special units for corners, floors, and roof assemblies round out the product lines and improve the engineering of the system and energy efficiency of the final construction.
Block sizes are typically on the order of 16 inches high by 48 inches long. The cavities are commonly six or eight inches wide but can be larger or smaller as needed. The foam faces are also capable of being varied, but 1-7/8- to 2-3/4-inch thickness is a usual range. So an 8-inch cavity with a two-inch foam face on either side would lead to a 12-inch formed wall. More recently some systems have developed the capability of offering thicker layers of foam to enhance performance.
After finishes are applied inside and out, typical final wall thickness is greater than one foot. This means that the depth of window and door surrounds have to be wider than what is used for traditional frame construction, with resulting deep window sills—a nice feature for homeowners or other building occupants.
Installation of insulating concrete form systems is similar to masonry construction. Builders usually start at the corners and place a layer at a time to build up the wall. Some units, particularly those that form a “waffle” or post–and–beam concrete wall profile must be glued together or taped at the joints during assembly. Most systems today feature uniform cavities that improve flowability of the concrete, reduce the need for adhesives during stacking, resulting in flat concrete walls of consistent thickness.
Once the forms are in place and braced and required reinforcement installed, concrete is pumped into the forms. Even with the bracing, forms need to be filled at an appropriate rate based on formwork manufacturer recommendation to prevent misalignment and blowouts. Product advancements and improved construction techniques have greatly reduced the potential for form failure. It seldom occurs when manufacturer recommendations are followed. Reinforcement in both directions maintains the wall strength. Openings for doors and windows require bucks to surround the opening, contain the fresh concrete during placement, and provide suitable material for fastening window or door frames.
Block-outs are needed when bearing pockets are required for floor or roof items. Insulating concrete form systems are compatible with concrete floors, and wood or steel floor joists. In smaller buildings, ledger assemblies for floor framing attachment mounted to the side of the formwork are common. In larger buildings or those for commercial uses, steel weld plates or bolt plates can be pre installed within the formwork so they become embedded in the fresh concrete.
Finishes are usually attached via the flat ends of metal or plastic ties embedded in the forming material. Finishes can alternately be furred out with furring strips. Almost any type of finish can be used with these systems. Wallboard remains the most common interior finish and is the most typical means of meeting the code requirement for a 15-minute fire barrier over plastic foams surrounding living spaces. Exteriors are much more varied and depend on customer preference. Cement plasters are applied over ICFs in a manner similar to other sheathed systems.
A major appeal of ICFs is the potential for reducing energy to heat and cool the building. Some estimates place the savings at 20 percent or more. The R-value for a typical Insulating concrete form is about 20. The walls can often have high air tightness 10 to 30 percent better than frame-with compatible windows, doors, and roof. As a result, assuming a 100-year service life, one single-family ICF home has the potential to save about 110 tons of CO2 compared to a traditional wood frame home. This more than offsets the CO2 associated with the production of the cement used to make the concrete. See graph below.
Thermal mass is one of the reasons that Insulating concrete forms work so well to maintain a consistent temperature; insulation is the other. As the graph above demonstrates, this saves quite a bit of energy associated with heating and cooling, which not only saves money, but also provides a more comfortable interior.
Insulating concrete forms save trees because the wood frame is eliminated. Insulating concrete forms systems can also contain a decent amount of recycled materials. Concrete can be made using supplementary cementing materials like fly ash or slag to replace a portion of the cement. Aggregate can be recycled (crushed concrete) to reduce the need for virgin aggregate. Most steel for reinforcement is recycled. Some polystyrenes are recycled.
From a sustainability viewpoint, the reduced operating energy, reduction of CO2, long service life, and use of local and recycled materials make ICF construction environmentally beneficial.
When ICFs were first introduced to North America, codes officials were not familiar with the system, so there was a learning curve associated with approval. As reinforced concrete walls, Insulating concrete forms are quite strong. But they are built in an entirely different manner than wood frame walls and require different evaluation criteria. Many form manufacturers performed testing and prepared Evaluation Service Reports or something equivalent to that as a way to demonstrate the wall system’s integrity. Groups that generate these reports include the International Code Council Evaluation Service, Inc. and the Canadian Construction Materials Centre.
As insulating concrete forms have increased in popularity, code approval has become much simpler. For one and two family dwellings, the International Residential Code (IRC) addresses foundations and below grade walls in Section R404 and above grade walls in R611 for homes up to two stories plus a basement. For larger buildings like multi-family and commercial structures, an engineer is typically required for structural design and an Evaluation Service Report documenting approval of the ICF for the type of construction mandated for the project will often be needed to finalize approval.