Formwork 101 - MEVA USA

21, Jul. 2025

 

Formwork 101 - MEVA USA

What is Formwork?

In a nutshell, formwork is the mold wherein fresh concrete is poured and formed. The mold, which can be permanent or temporary, holds the poured concrete and shapes it until it solidifies and becomes strong enough to support itself and other loads.

Zolo Product Page

Formwork is also known as “shuttering.” However, in certain parts of the world, shuttering refers to using plywood or timber to create the mold.

Formwork systems can be classified according to the following parameters:

  • Types of material used to create the mold (plastic, steel, timber, aluminum)
  • Types of concrete structure it supports (slab, column, wall)

Construction costs usually consist of building materials (ca. 45%), labor (ca. 45%), and operating expenses (ca. 10%). Formwork material comprises 15% of the total building material and contributes roughly 44% of the total labor. Meanwhile, formwork construction accounts for up to 25% of the total cost of building the structure. For this reason, many builders and construction companies prefer reusable forms (panel forms). The process of removing formwork is called “stripping.”

2. Column

As the name suggests, column formwork is used in the construction of circular or rectangular columns. Columns have formwork sections with a “closed load transmission,” which is supported by the formwork’s design and the guaranteed tensile strength rather than by using ties.

Steel formwork is often used to form circular columns as it is economical and available in incremental dimensions. Single-use forms, which are destroyed and disposed of during stripping, can be used as an alternative. However, using single-use formwork is not advisable if you need to construct multiple circular columns.

Meanwhile, rectangular columns are formed using three systems depending on their specifications. For instance, classic timber girders with steel walers and a plywood facing are often used when builders need to construct a significant number of columns with special dimensions. The windmill system, which is composed of columns or multipurpose panels of frame formwork systems, is suitable for building single columns with a standard dimension.

Finally, a foldable column formwork is highly suitable for columns with great heights. Because all the essential components (panels, connecting devices, ladders, and access platforms) are integrated into this type of column formwork, it helps builders reduce their construction time and costs.

3. Wall

Wall formwork comes in different types and classifications, as outlined below.

Conventional
Conventional wall formwork consists of boards or sheets and squared timber. It is flexible, but it can be costly and time-consuming as each component must be assembled on-site. In addition, all of its parts should be made according to the project’s specifications, and they must be nailed together and dismantled again after concreting.

Girder

This is a better version of the conventional formwork. Its components, which usually consist of dimensionally stable girders with two chords and one web, have been standardized to facilitate the assembly of identical and ready-to-use panels. The connection of the panels has also been systematized.

Frame
This type of wall formwork helps reduce labor time since its essential components (forming face, support for forming face, and steel walers) are assembled as one panel. The profile nose of the frames protects the edges of the forming face, thereby extending its lifespan. Connecting devices are used when assembling the frame panels to large-sized units, which are then usually transported by crane.

Crane-independent (hand-set)

This type of formwork can be moved by hand. Because of weight considerations, it is usually made of aluminum or plastic. It can take less concrete pressure than crane-dependent formwork, and is often used in housing and municipal construction projects.

Crane-dependent 

Crane-dependent formwork systems feature a large frame and formwork panels, usually made of steel. As a result, they cannot be moved manually. Since they can resist more fresh concrete pressures than crane-independent forms, they are suitable for the construction of commercial buildings and other extensive infrastructure projects.

Two-sided
As the name implies, two-sided formwork is erected on both sides of the wall. Its formwork ties, which are usually sleeved by spacing plastic tubes so they can be reused, take up the fresh concrete pressure. Push-pull props or large heavy-duty braces are attached to the formwork to align and secure it against wind loads during operation.

Single-sided
Single-sided formwork is used when the concrete has to be poured against existing structures or when builders need to do concreting against a hill or soil. This is why it is most suitable for reconstruction jobs. With this type of formwork system, concrete pressure is transferred from the formwork to the base plates through a support structure. 

Prefabricated
This formwork consists of two prefabricated concrete panels which are assembled in advance, and then transported and filled with concrete on-site. Braces and push-pull props are often used to secure the walls, while working and safety scaffolds are installed with the help of special adapters to make the construction process more cost-effective. Prefabricated formwork helps minimize project duration and labor costs. However, pre-planning is required to ensure that it is transported safely to the site.

Circular
Circular formwork is designed for the construction of curved and polygonal walls. It is also quite useful in the construction of specific concrete structures, such as septic tanks and car park ramps. This formwork system comes in three different types:  

  • Round girder – timber spacers are added between the timber girders and steel walers so the formwork can be adjusted to the required radius. 
  • Flexible girder – ideal for the construction of curved walls with different radii. It comprises timber/steel girders and a spindle, which allows builders to adjust the formwork to the required radius without having to reassemble the panels.
  • Polygonal – existing “flat” frame formwork panels can be refurbished as polygonal formwork by adding supplementary radius panels and rails, allowing builders to minimize their project costs.

Climbing
Climbing formwork is quite useful in the construction of high-rise concrete structures, such as control towers and skyscrapers, because it climbs with the wall. It comprises large wall formwork mounted to a climbing scaffold. There are three different types of climbing formwork:

  • Crane-dependent – the climbing unit (scaffold and formwork) requires the use of a crane to reach the next cycle.
  • Self-climbing – an automatic climbing system that does not require the use of a crane to reach the next suspension point. Hydraulic rams/pumps lift the scaffold, secondary platform, and formwork to the next pouring cycle. It is ideal for the construction of very tall concrete structures.
  • Slipform – a two-sided formwork that slides upwards along the structure being built at a rate of 20–25cm per hour. A system of pipe rods, which is integrated into the already-set concrete, supports the slipform.
     

MEVA is an industry leader offering a wide variety of wall formwork systems that provide highly efficient shuttering, flexibility, and reliability. Our products are lightweight and easy to assemble, and therefore will facilitate the rapid completion of your construction projects. Click here to learn more.

Want more information on Wall Formwork? Feel free to contact us.

Top 10 Efficient Formwork Solutions for Faster & Safer Construction

In today’s fast-paced world, completing construction projects has become a need. It has become necessary to complete projects on time without compromising quality; hence, formwork is given so much importance in fast construction.

Formwork in construction is important for shaping and supporting concrete structures and speeding up the construction process by ensuring fewer errors and mistakes. Because of the formworks, building accurate structures has become easier and has helped workers and constructors save time, reduce labor, and lower costs. This detailed guide will explore the top 10 efficient formwork solutions to speed construction and ensure high-quality results.

Why an Efficient Formwork Solution is Critical for Faster Construction?

An efficient formwork solution is extremely important as it affects the construction work process, performance and efficiency. Having efficient formwork will ensure a smoother construction process; without good formwork, construction can be slow, unsafe, and expensive.

Here are some of the benefits of having an efficient formwork solution. 

  • Firstly, efficient formwork solutions help reduce the time needed to set up, pour concrete, and remove moulds. Unlike traditional formworks, which require a lot of time for assembling and disassembling, efficient formwork reduces time and speeds up the construction process. 
  • Efficient formwork, like modular formwork, needs fewer workers to handle as they are typically lightweight and easier to handle than your regular formwork. Moreover, most of the efficient formwork solutions can be used for all projects to save time and cost.  
  • Efficient formwork also ensures smoother finishes, reducing the need for extra finishing work to achieve the desired aesthetic result. 
  • Efficient formwork is undoubtedly cost-effective and environmentally friendly. Unlike traditional formwork like wood or plywood, which are often discarded after a few uses, efficient formwork will last long, and most of the materials can be reused up to 100 times. 

Top 10 Efficient Formwork Solutions for Faster Construction

Now that we have discussed why efficient formwork is important, it’s time to look into the top 10 efficient formwork solutions you would find in construction. 

1. Modular formwork system

These formwork systems are meant to reduce construction waste. They are lightweight, and they can be reused multiple times with reusable formwork panels. Furthermore, they are easy to handle, significantly reducing labor and time.

2. Plastic formwork system

Plastic formworks are lightweight, durable, and reusable formwork solutions designed for modern construction. Made from high-quality plastic, they are resistant to moisture, corrosion, and warping, making them ideal for long-term use. Unlike traditional formwork, plastic formworks are easy to handle, requires minimal maintenance, and reduce labor costs. Their modular design ensures quick assembly and dismantling, improving construction efficiency and sustainability.

3. Climbing formwork system

This formwork is designed to be used while building high-rise buildings and structures. They are mostly automatic; hence, they can move on their own. This ensures safety and speed while working on such projects. Climbing formworks are generally ideal for structures like skyscrapers, bridges, and towers.

4. Table formwork system

It is a ready-to-use system that is often used to construct large floor slabs. Through table formworks, the need to assemble formwork becomes unneeded. This type of efficient formwork is ideal where multi-story building slabs must be constructed quickly. 

5. Tunnel formwork system

Tunnel formworks are prefabricated systems that are used to build walls and slabs simultaneously in a single operation. This greatly improves the construction process and ensures all the walls and slabs have the same precision and maintain consistent quality.

6. Column formwork system

This formwork is designed to shape and support columns during curing. They are quick to set up. Column formwork systems also come in various types and shapes that can be used efficiently to create intricate designs. 

7. Wall formwork system

A formwork system is used to construct vertical concrete walls. Wall formwork system type is commonly made using steel, aluminium, and plastic formworks. Just like other formworks, they ensure smooth wall surfaces with accurate dimensions.

8. Beam formwork system

A beam formwork system is used when building horizontal beams in a structure. Beam formwork supports the weight of wet concrete during the curing process and speeds up the construction process with minimal support. They are often used in larger construction projects. 

9. Precast formwork system

They are completely opposite to traditional formwork systems where one has to cut and assemble them on-site; precast systems, on the other hand, come with precast mold that just needs to be set up on-site, saving time. Compared to traditional formwork, they also provide smooth finishes and have higher quality and consistency rates. 

10. Foam formwork system

This type of formwork system is made using high-quality forms or polystyrene. This formwork is commonly used to build intricate designs. Moreover, they are lightweight and easy to handle. This makes it easier for workers to create an arch-like structure for the project. 

NovaFormworks: Leading the Way in Efficient Formwork

For any formwork system to be efficient, it’s important to have reliable formwork providers, like NovaFormworks, which can provide durable, lightweight designs and cost-effective forms.

NovaFormworks is one of the leading plastic formwork suppliers in Bangalore.

Their plastic forms are made of premium quality, and they are more economical in the long run than traditional formworks.

Unlike traditional formwork, NovaFormworks’ plastic formworks require minimal maintenance, are easy to handle, and significantly reduce labor costs. Their modular design allows for quick assembly and dismantling, ensuring faster and more efficient construction processes. This makes them suitable for all the projects. 

Also Read >> Key Features to Identify High-Quality Plastic Formwork

Conclusion

In the construction industry, where time is money, having an efficient formwork system is key to success.

Having the right formwork system can make a huge difference and help you finish your construction work ahead of time. Various efficient formwork solutions could help achieve faster, safer, and more cost-effective results. Moreover, going with NovaFormworks formwork systems makes the construction process much smoother. 

If you are looking for more details, kindly visit Column Formwork.