The aim of this article is to highlight the requirements that may exist for a given building project, and indicate how these requirements should drive the designer towards the most appropriate, sustainable, potentially reusable and cost-effective choice of floor system.

KAIYAO supply professional and honest service.

The range of steel based floor systems is presented in general terms, with the advantages and disadvantages of each system identified so that these can be compared against the requirements of a given project. The article does not go into technical detail about the different types of composite, long span, and shallow floor solutions.

[top]What drives the choice of floor system?

Different buildings have different requirements, so not surprisingly there is no 'one size fits all' most appropriate solution. Clearly the requirements vary depending on the type of use, but there are also some more subtle issues to consider and these are highlighted below.

It should not be forgotten that when considering intended use, it may be appropriate to pay attention to a different use in the future - many steel solutions offer flexibility that can result in high levels of sustainability over the lifetime of a building.

[top]Simplicity and familiarity

As a rule of thumb designers should adopt the simplest solution that will meet the project requirements. Generally speaking the simplest solution will also be the most common, and familiarity will facilitate the design, fabrication and erection processes as no new learning is involved.

Within the context of steel floor systems, simple also means less labour and cost . For example, the simplest solution of a downstand solid web I-section beam as opposed to a truss means fewer structural elements, less fabrication , fewer surfaces to be fire protected and less time to design.

It is worth adding that this 'simple is best' philosophy also extends to frames as a whole - a simple braced frame will normally be a more economical solution than, say, a moment resisting frame.

[top]Speed of construction

For some projects the need to reduce to a minimum the construction time (on site) may play a determining role. Indeed, time is often one of the key drivers for choosing a steel solution. The need for speed may be driven by, for example, fitting in with vacation breaks for educational buildings , or bringing in income (e.g. retail buildings). It can lead to consideration of options that minimise wet trades on site (use of precast floor units), minimise the number of crane lifts and provide working platforms during construction (profiled steel decking), and that do not require propping between floors.

[top]Service integration

The volume of services needed in a building is clearly a function of the end use - hospitals being an obvious example of a highly serviced building - and design philosophy adopted by the services engineer, e.g. air-conditioned, naturally ventilated, etc.


When a lot of service ducts are to be accommodated it may be beneficial to adopt a floor solution that provides a flat soffit in order to maximise the flexibility in routing these ducts beneath the structural floor. It will also be easy to remove and/or replace these ducts to meet future needs.

Solutions that provide a flat soffit may not suit the longer spans needed to facilitate a column-free adaptable floor area. An alternative in a building that is both highly serviced and requires long-span floors is to integrate the services within the beam depth (as shown to the right), so that the total depth of structural floor plus service zone is minimised.

[top]Need for adaptable space

One of the long-recognised benefits of steel frame construction has been its ability to span significant distances. This is particularly true when composite solutions are adopted, given the efficiencies of that form of construction. This spanning ability allows the number of internal load bearing walls and columns to be minimised - open floor spaces can be created, or non load-bearing partitions (that are easily moved) used to form (temporary) individual areas. Adaptability may be more sustainable than deconstruction and reuse, for which steel is also suited. In recent years a number of steel framed office buildings have been reconfigured to provide residential units.

[top]Daylighting requirements

'Deep' floor plans may mean that, for example, office workers are a long way from natural lighting. Long span solutions may not then be the most appropriate solution for certain situations, where a short span design (for example using shallow floors ) with an internal atrium may provide a more appropriate internal environment. The designer must seek the best compromise.

[top]Aesthetics

If false ceilings are used then the aesthetics of the soffit of a given structural floor system are clearly irrelevant. However, clients may require exposed soffits, specified primarily so that the thermal mass of the floor is exposed. The soffit must also then be visually appealing. In some cases the presence of downstand beams interrupting the soffit may not be welcome, although it is also true that an expressed structure may be desired. A number of steel framed options may therefore be appropriate depending on specific requirements.

[top]Acoustics

The speed with which steel-framed buildings can be constructed, combined with excellent performance in service, was one of the reasons why steel frames with composite floors played such a central role in the boom in the multi-storey office market in the UK in the late s and s. When designers wished to transfer this technology to residential buildings some years later, it was recognised that possibly the biggest difference in requirements was issues associated with acoustics .

Good detailing is needed to avoid flanking issues, where sound travels around a barrier (such as a floor) by passing through an adjoining wall. An example, in accordance with the guidance provided in SCI P372, is shown below. The SCI has also developed an acoustic performance prediction tool for separating floors and walls to assist designers and architects.

Numerous apartment buildings have been constructed using steel frames, with a combination of good detailing and proprietary products used for raised floors, providing the necessary levels of performance. Deansgate in Manchester was an early example of this 'technology transfer' (see right).

[top]Fire resistance

Fire resistance requirements depend on the use and height (number of storeys) of a building. Fire resistance periods between 60 minutes and 120 minutes are typical. The most common solution adopted to provide fire resistance is to protect the steel members so that they remain at a sufficiently low temperature (recognising that some loss of steel strength as temperature increases is acceptable as loads in fire are reduced compared to loading at ambient temperature). Intumescent coatings, (paint-like substances that char and expand with temperature to provide an insulation layer), are often used. If the steel elements are embedded in concrete this can provide the necessary insulation. Other options include board protection and the use of a cementitious spray.

Alternatively, when a 'fire engineering' approach is adopted the steel members are designed so that they are sufficiently strong, even when material strength has been lost due to exposure to fire, to resist the appropriate levels of loading. Extensive guidance, based on full scale fire testing of complete buildings, is available (SCI P375)

[top]Thermal mass

Provision of sufficient thermal mass is an important part of a low energy building solution. The mass provides a heat sink that absorbs heat during the day, and then in combination with natural ventilation the heat is purged during the cooler night time. Composite floor slabs may even be constructed with integral water ducts to aid this purging. It is important that the thermal mass is exposed - so false ceilings may be a problem, as is plasterboard attached with dabs to otherwise massive walls. Horizontal elements (floors) are much more effective at providing mass than vertical elements.

When deciding how much mass is needed it is important to consider the occupation pattern of a building. Massive structures can absorb a lot of heat, but they also provide thermal inertia when wanting a building to heat up rapidly. There is a common misconception that a very massive building is necessary to exploit the benefits of thermal mass.

[top]Floor stiffness

Stiffness is needed to ensure that a floor behaves correctly from a dynamic point of view, thereby assuring user comfort. This is a complex subject, as the real issue is how the floor responds (in terms of acceleration), which is a function of a number of variables including stiffness and the mass that is mobilised. The traditional approach, which is recognised as being crude, for designing a floor to respond acceptably is to check its natural frequency and compare that with a limiting value (which is a function of the floor mass). A more thorough approach is recommended, which often yields less conservative but satisfactory, results. See SCI P354.

A web-based Floor response calculator is available that allows designers to make an immediate assessment of the dynamic response of a floor solution. The software reports the results of approximately 19,000 arrangements of floor grid, loading and bay size, which have been investigated using finite element analysis. The results from this software provide an improved prediction of the dynamic response compared to the ‘manual method’ in SCI P354. The software may be used to examine complete floor plans or part floor plans, comparing alternative beam arrangements.

The required behaviour depends on the function for a given building/room. Some uses are less tolerant to floor movements (e.g. an operating theatre). Some uses (e.g. a gymnasium within an office building) are more likely to cause problems and warrant particular attention to avoid other building users being affected.

[top]Deconstruction

There has been considerable interest in the benefits of designing for deconstruction . The ability to dismantle a building and use the components again elsewhere is clearly attractive from a sustainability point of view, and steel lends itself to such a solution.

Research has been carried out on innovative shear studs, which allow composite slabs to be readily separated from the steel beams. Other initiatives involve the use of cross-laminated timber (CLT) used as a floor panel, used compositely with steel beams, but may be removed from the supporting steelwork as the building is deconstructed. Guidance on the recovery, testing and design of reused steelwork is available in SCI P427. Digital records of completed buildings, including information on the steel grade, impact properties and chemical composition should facilitate the efficient reuse of steel structures when a building reaches the end of its useful life.

[top]Cost

As noted above, unless project specific drivers suggest the adoption of a more sophisticated alternative, then the simplest solution should be chosen and this will normally prove to be the most cost effective.

Cost is a fundamental consideration in the selection of the frame and floor system. Late in , the BCSA and Steel for Life commissioned AECOM to provide a series of building type specific cost comparisons for office, education, residential/mixed-use, retail and industrial buildings, based on actual buildings. The buildings selected were originally part of the Target Zero study conducted by a consortium of organisations including Tata Steel, AECOM, SCI, Cyril Sweet (now Currie & Brown) and BCSA in to provide guidance on the design and construction of sustainable, low and zero carbon buildings in the UK.

The cost comparisons presented in the ‘Costing Steelwork’ series update the cost models developed for the Target Zero project, and provide up-to-date costs for the alternative framing solutions considered for each of the five building types.

The cost comparison studies illustrate that for a range of building types, on a like for like basis steel frame and floor solutions are highly competitive. The studies also highlighted the importance of considering total building cost not just structural frame cost, as the choice of the structural frame and floor configuration will have associated impacts on many other elements, including the substructure, roof and external cladding.

[top]Benefits of different floor systems

[top]Slab options

[top]Composite slabs

Composite slabs, comprising lightly reinforced concrete cast on profiled steel decking, are an option whether the beams are downstand or integrated within the slab depth for a shallow floor form of construction. The slabs are normally reinforced using an upper layer of mesh and, occasionally, additional bars in the troughs (usually for longer periods of fire resistance and heavy loads). Fibre reinforcement may also be used. Spans of up to 4.5 m can be achieved using trapezoidal decking (80 mm deep). Some so-called deep decking profiles also exist (over 200 mm deep), that can span 6 m or so without propping during construction.


Composite slabs are an excellent choice when speed of construction is important. Bundles of decking are lifted into place on the steel structure, for distribution by hand. The number of crane lifts needed, when compared with the precast alternative, is greatly reduced. The ability to stack the pieces of decking into bundles also reduces transport time and costs.

During construction, once in place the decking provides other benefits in terms of acting as a working platform for storage of materials. When appropriately orientated and fixed to the steel beams it can restrain them against lateral torsional buckling. See SCI P300 .

Composite floor systems

In the final state the ribs in the decking serve as void formers in the slab, thereby reducing the weight of floor construction with the knock-on benefits this can have. It is also possible to suspend services from the soffit of a composite slab, using anchors that are designed to slot into the decking profile.

A number of methods can be used for controlling the concrete level during construction. The concrete depth may be kept constant, or the upper surface may be kept level. Depending which of these is chosen the weight of concrete will vary, so it is important that the designer communicates clearly with the site team. See SCI AD410. Further guidance on the installation of metal decking is also available.

When an exposed soffit is required - to expose thermal mass - a thermally transparent suspended ceiling may be used. The additional surface area of the soffit created by the decking (as opposed to a flat concrete face) can be beneficial.

[top]Precast units

Precast concrete units may be used in conjunction with steel beams. The units may be solid or hollow-core, and with tapered or bluff ends. They are normally prestressed. The beams may also be structurally connected to the slab units to make them 'composite', provided specific detailing rules are satisfied to ensure that the steel section and concrete (in-situ topping plus the precast units) act together. SCI P401 gives further information on this.

Floors using precast units offer a number of benefits. The spanning ability of the units is such that the spacing of secondary beams can be increased (compared to when traditional decking profiles are used). The construction system is most efficient for column grids of approximately 9 m by 9 m. The units provide a flat soffit.

For semi-exposed applications, such as car parks, precast units may be a more durable alternative than steel decking (although with the correct detailing and coatings it is certainly possible to use decking in such applications).

Precast floors

[top]Downstand beam systems

The most common type of composite beam is one where a composite slab sits on top of a downstand beam, connected by the use of through deck welded shear studs. This form of construction offers a number of advantages - the decking acts as external reinforcement at the composite stage, and during the construction stage acts as formwork and a working platform. It may also provide lateral restraint to the beams during construction. The decking is lifted into place in bundles, which are then distributed across the floor area by hand. This dramatically reduces the crane lifts when compared with a precast based alternative.

For more steel flooring panelsinformation, please contact us. We will provide professional answers.

Further guidance on practical aspects of decking placement may be found in the best practice guide SCI P300.

Another common type of composite beam is one where, as with a traditional non-composite steel framed solution, a precast concrete slab sits on top of the top flange of the steel beam. The effective span range for this type of solution is around 6 to 12 m, which therefore makes it a competitor to a number of concrete flooring options. Particular detailing is required for the shear connection when precast units are used, so that the body of the precast units can be mobilised as part of the concrete compression flange. See SCI P401 for more information.

[top]Long-span beams

A number of variations on the idea of downstand beams is available to meet long-span needs. The use of long span beams results in a range of benefits, including flexible, column free internal spaces, reduced foundation costs, and reduced erection times. Many long span solutions are also well adapted to facilitate the integration of services without increasing the overall floor depth.

[top]Shallow floors

Shallow floors offer a range of benefits such as minimising the overall height of a building for a given number of floors, or maximising the number of floors for a given height of building. Additionally, a flat soffit is achieved - there are none of the interruptions found with downstand beams - which gives complete freedom for the distribution of services below the floor. These benefits should be considered in the context of a given project to identify when they are most appropriate.

The shallowness of the floors is achieved by placing the slabs and beams within the same zone. This is achieved by using asymmetric steel beams with a wider bottom than top flange, which enables the slab to sit on the upper surface of the bottom flange with adequate bearing, rather than the upper surface of the top flange as found with downstand beams. The floor slab may be in the form of a precast concrete slab or a composite slab with metal decking (either shallow or deep decking may be used). An added benefit is that some forms of shallow floor construction inherently achieve composite interaction between the beams and slab, thereby enhancing structural efficiency.

A number of shallow floor solutions are available, including Ultra Shallow Floor Beams (USFB) from Kloeckner Westok, and ArcelorMittal's Slim Floor solutions.


Kloeckner Metals UK Westok’s USFB system comprises a shallow and asymmetric Westok cellular beam with reinforcement placed through the cells to anchor the slab to the beam. This simple detail provides a straightforward and cost-effective arrangement to prevent disproportionate collapse and is also used to resist torsion in the final condition. For composite slabs with metal decking the reinforcement is placed in the troughs of the metal decking. With hollowcore slabs, the reinforcement is placed in alternative cores of the precast unit. To restrain the top flange of the USFB in the Normal Stage, the insitu concrete should be cast flush with, or with at least 30 mm cover over, the top flange.

The USFB is manufactured from standard rolled sections, and is available in increments of 1 mm depth. They are typically 150-300 mm deep and are sized and designed using Westok’s freely available Cellbeam software package based on each individual project requirements and floor grids etc. The software carries out all of the necessary structural checks, including torsion checks in the Construction Stage. USFBs can economically span up to 10 m with structural depths that compare very favourably with R.C. flat slabs. As such, they are popular in many sectors, particularly Education, Commercial and Residential.

‘Plug Composite Action’ can be mobilised for USFBs, which has been demonstrated using full-scale laboratory testing, to further enhance the capacity of the section. To mobilise ‘Plug Composite Action’, the following detailing should be adopted:

  • Composite slabs with metal decking: Concrete cast level with, or above, the top flange
  • Precast units generally: Minimum 50 mm topping level with, or above the top flange
  • Hollowcore units: Every 2nd core broken out and filled with concrete and reinforced through the cell
  • Solid in-situ slabs: Concrete cast level with (or above) the top flange

[top]Resources

  • SCI P287, Design of Composite Beams using Precast Concrete, (An updated Eurocode version of this publication, P401, is available from SCI)
  • SCI P354, Design of Floors for Vibration. A New Approach, Revised Edition,
  • SCI P372, Acoustic Detailing for Steel Construction,
  • SCI P300, Composite Slabs and Beams using Steel Decking: Good Practice for Design and Construction, (3rd Edition),
  • SCI P375, Fire Resistance Design of Steel Framed Buildings,
  • SCI P401, Design of composite beams using precast concrete slabs in accordance with Eurocode 4,
  • SCI P427 Structural Steel Reuse, Assessment, testing and design principles,
  • SCI AD410, Pouring concrete to a constant thickness or to a constant plane,
  • SCI Acoustic performance prediction tool for separating floors and walls
  • Floor response calculator

[top]See also

Steel Floor Systems: Types, Advantages, and Applications

Steel floor systems began in the 19th century, when cast iron was widely used for its load-bearing and durability. With the emergence of high-strength steel, steel floors gradually replaced cast iron. After entering the 20th century, modern steel floor systems became lighter and stronger, with better earthquake resistance, fire resistance and environmental protection performance, and were widely used in various types of buildings.

We will deeply analyze the types and selection criteria of steel floor systems, how to choose the right floor system according to different building needs, and ultimately provide efficient, economical and sustainable solutions for your project.

What is a steel floor system?

A steel floor system is a structural system supported by steel beams and steel joists, usually combined with concrete slabs to form a composite structure. It mainly supports ground loads through the high strength and durability of steel, and is often used in construction projects that require large spans and high load-bearing capacity.

Main types of steel floor systems

When choosing a steel floor system, the span, structural requirements and budget of the building will determine the appropriate type. Various steel floor systems possess unique characteristics and cater to distinct building requirements. Subsequently, we will delve into the specifics of several prevalent types of steel floor systems.

Short span composite beams and metal plate composite floors

Applicable scenarios: This system is particularly suitable for small span buildings, usually used in buildings with a span of 3-4 meters. For example, some small construction projects such as low-rise buildings, warehouses, and shops.

Advantages:

  • Low cost: Due to the simple structure and less steel consumption, short span composite beams and metal plate composite floors have cost advantages. For small projects with limited budgets, it is an economical and efficient choice.
  • Light weight: Compared with some traditional materials, steel is lighter, which reduces the requirements for foundations and supporting structures and simplifies the construction process.

Disadvantages:

  • More columns are required: In order to support the floor, short span structures often require more columns, which will affect the utilization of space. Especially in places where open space is required, it may not be suitable.
  • Thick floor: In order to meet the load-bearing requirements, thicker floors are usually required, which may affect the overall height or appearance of the building in some cases.

Long-span composite beams and metal plate composite floors

Applicable scenarios: This system is suitable for buildings with large spans and column-free spaces (10-18 meters). It is extensively utilized in commercial structures, office towers, airports, stadiums, and various other venues that necessitate wide spans.

Advantages:

  • Provide large space: The biggest advantage of this system is that it can provide large-span open space, reduce the number of internal columns, and provide more flexible use of space. For example, internal pillars can be removed in office buildings to create a more open and flexible space layout.
  • Reduce the number of columns: The long-span design allows the building to reduce the number of supporting columns, save space inside the building, and provide greater flexibility and aesthetics.

Disadvantages:

  • Thick floor: Due to the need to bear greater loads, long-span composite beams usually require thicker floors to ensure the stability of the structure, which will increase the difficulty of construction and transportation.
  • High steel consumption: The amount of steel required for long-span design is large, resulting in an increase in overall costs. In projects with limited budgets, it may be necessary to weigh whether to choose this type.

Composite beams and precast concrete units

Applicable scenarios: This steel floor system is suitable for medium span (6-9 meters) buildings. It is often used in projects such as commercial buildings, industrial plants, garages, etc., especially in situations where a higher load-bearing capacity is required.

Advantages:

  • Reduced number of secondary beams: Compared with traditional structures, composite beams combined with precast concrete units can reduce the need for secondary beams, thereby simplifying structural design and reducing construction burden.
  • High construction efficiency: Since the concrete units are precast, they can be installed quickly during the construction process, greatly shortening the construction period. The use of this precast component makes construction projects more efficient and time-saving.

Disadvantages:

  • Complex installation of precast units: Although the use of precast units improves construction efficiency, their installation requires precise positioning and technical support. If the site conditions are poor or the technology is not mature enough, it may increase the difficulty of installation and affect the construction progress.

Non-composite beams and precast concrete units:

Applicable scenarios: Suitable for buildings with a span of 6-7.5 meters, especially suitable for small and medium-sized construction projects, such as low-rise commercial buildings, residential buildings and some light industrial facilities.

Advantages:

  • Simple structure: The design structure of non-composite beams and precast concrete units is simple, and the construction is relatively easy, which is suitable for rapid construction, especially in projects with tight budgets.

Disadvantages:

  • Steel beams are prone to torsion: Steel beams are prone to twisting during the force process, so temporary support is required to ensure the stability of the structure, which may increase the complexity and time of construction.
  • Requirement of temporary support: Due to the easy torsion characteristics of steel beams, additional support systems are required during construction, which increases the cost and workload of temporary support.

Honeycomb composite beams and composite panels

Applicable scenarios: Suitable for long-span buildings of 10-18 meters, commonly seen in places that require large spaces and fewer columns, such as gymnasiums, large exhibition centers, airports, etc.

Advantages:

  • Provide large space: The honeycomb composite beam system is very suitable for buildings that require large spans and column-free spaces. By reducing the number of columns, this system provides a larger open space.
  • Openings can be used to install service facilities: Due to the unique structural form of the honeycomb beam, it can allow enough space between the beams for burying infrastructure such as pipes and wires, avoiding the addition of additional pipe shafts in the building.

Disadvantages:

  • Higher manufacturing cost: Due to the complex structure of honeycomb beams and composite panels, the manufacturing cost is high, which is suitable for projects with sufficient budget and high structural requirements.

Each of these steel floor systems boasts its unique characteristics and suitable applications. When making a selection, factors such as the span, intended use, and budget of the building must be taken into account. Should you have any specific needs or inquiries, please feel free to reach out to us. We will analyze which system is most suitable for your project based on the actual situation.

Applications of steel floor systems

Steel floor systems are widely used in many fields due to their superior performance, especially in buildings that require large spans and high load-bearing capacity.

  • Commercial buildings: such as office buildings, shopping malls, etc., steel floor systems can provide large spans and open spaces, suitable for commercial environments that require flexible design and efficient use of space.
  • Industrial buildings: such as factories, warehouses, etc., can withstand heavy loads, suitable for heavy equipment and cargo storage, ensuring the stability and safety of the structure.
  • Residential buildings: such as apartments, villas, etc., suitable for residential designs that require flexible layouts, providing greater spatial flexibility and comfort.
  • Parking lots: Multi-storey parking lots require large spans and column-free spaces. Steel floor systems are very suitable in this scenario, which can maximize the use of space and simplify structural design.

Design and construction considerations for steel floor systems

When designing and constructing steel floor systems, we take into account building functions, safety, and construction efficiency to ensure the best performance of the system.

Design considerations

Span and load: We will select the appropriate span and load capacity based on the purpose of the building. Commercial buildings usually require large spans (such as more than 10 meters) to provide flexible space, while industrial buildings need to withstand large loads, so when designing, we must ensure that the bearing capacity and span of the floor meet actual needs.

Fire protection and sound insulation: Although steel has certain fire resistance, for residential and commercial buildings, especially high-rise buildings, it is usually necessary to use fire-resistant coatings or composite with concrete to enhance fire resistance. Fire safety is crucial in these projects, and we always follow strict standards to ensure that customer needs are met.

Service integration: In the design, the integration of service facilities such as pipes and cables must also be considered. We will ensure that there is enough space when designing the steel floor system to facilitate the layout and installation of these service facilities and ensure the efficient realization of functions.

Construction considerations

Prefabrication and on-site installation: The use of prefabricated components can increase construction speed and shorten construction period, but it also requires more precise construction plans to ensure accurate docking between prefabricated components and on-site installation.

Cost and Economic Benefits of Steel Floor Systems

Initial Cost: The initial investment in steel floor systems may be relatively high, mainly due to the complexity of steel and structural design. However, in the long run, its economic benefits are considerable. The durability and low maintenance requirements of steel floor systems enable them to effectively control costs throughout their life cycle, especially in terms of extending service life and reducing maintenance costs.

Construction Efficiency: Due to the prefabricated nature of steel floor system components, the construction process is expedited, leading to a substantial reduction in the overall construction timeline. This quick installation not only helps to improve the overall progress of the project, but also effectively reduces labor costs and additional costs caused by delays during construction.

High Quality Steel Floor System, You Can Rest Assured

The steel floor system products we provide, combined with high-quality steel and advanced design concepts, can meet the needs of various construction projects. Whether it is to improve construction efficiency or ensure long-term stability, our solutions can bring significant economic benefits and performance advantages to your project.

If you are interested in our products, please feel free to contact us. We will provide you with professional advice and help you achieve the best steel floor system application in your project.

If you are looking for more details, kindly visit stainless steel floor tile.