Cutting Pre-Stressed Strands in Concrete Structures | Wells

13, May. 2024

 

Cutting Pre-Stressed Strands in Concrete Structures | Wells

Determining When to Cut Pre-Stressed Strands in Concrete

When can we cut the strand to transfer its prestress force to the concrete in the form of a compression squish?  ACI 318-14 specifies a maximum stress of 0.6f’ci’, however, PCI states that common industry practice allows us to increase this to 0.7f’ci’ .

If you are looking for more details, kindly visit Super PC Strand.

This means that however much compression stress we are adding to the concrete member by all the tensioned strand, while considering self weight of the member, we must have a minimum of 1.43 times that compressive stress in the concrete when the strand is cut. Once cylinders have been broken to verify the concrete’s compressive strength meets this requirement, only then can we cut strand and strip the pre-stressed concrete member.

So now that we have cut the strand, what stops the strand from shrinking to its original length and how does the initial prestress force get transferred to the concrete member?  By its bond to the concrete. The length required to bond the initial prestress force of the strand is called the transfer length.  ACI 318-14 defines this transfer length as dbfse / 3 where db is the diameter of the strand in inches, and fse is the effective prestress, in ksi, after all losses (figure 5). If we have one strand pulled to 31,000 lbs, the transfer length is the length required to put the 31,000 lbs, minus some losses, into the concrete member. So, fse is the effective stress put into the concrete, by the strand, that decides whether the concrete member will be uncracked, in transition to cracking, or a cracked member, under a specified loading condition, after all losses are taken into account.

Understanding Losses in Pre-Stressed Strands

What exactly are these losses that keep getting mentioned?  Loss of prestress force is the reduction of prestress force in strand due to elastic shortening, shrinkage, creep, and other external factors. So if we pull 31,000 lbs on a strand, we don’t necessarily get 31,000 lbs into the concrete at final service loading conditions.

  • In elastic shortening, the concrete around the strands shortens as the prestress force is applied to it.
  • During plastic shrinkange, the hydration of cement results in a reduction in the volume of the concrete.
  • Drying shrinkage appears after the setting and hardening of the concrete mixture due to loss of capillary water.
  • Creep is the time dependant deformation of hardened concrete due to a permanant force.

In all these losses, strand goes along for the ride and shrinks as well. Creep in the strand, also known as relaxation, is a reduction of force, in the strand, under constant strain. Once the strand is pulled, then released, the extra length required for the strand chuck to properly seat and hold the strand is a type of external loss. All these losses add up, to reduce the initial pull, or initial stress, to the actual pull, or effective stress, fse.

Determining the Ultimate Strength and Development Length in Pre-Stressed Strands

But what if we want to know when the strand will break? This limit is called ultimate strength or nominal strength. How much more bond length is required? The total length required to develop a strand’s ultimate strength is called the development length.  ACI 318-14 defines the development length as (fps – fse)db plus the transfer length, where fps is the stress in the strand when a concrete member fails in bending.  The transfer length is always a portion of the development length (figure 5). In figure 6, the transfer length can be seen going from zero to the dotted fse = 170 ksi effective stress line, and the full development length goes all the way up to the dotted fpu = 270 ksi line, where fpu is the specified ultimate strength of the strand.  For our ½” strand pulled to 31,000 lbs, and assuming 15% losses, we get an effective stress of around 170 ksi.  The transfer length to apply 170 ksi to the concrete is approximately 27” and the development length to break the strand at 270 ksi is approximately 78”.  Notice in figure 6, that a partially debonded strand’s transfer and development length are doubled.  This occurs when strand is intentionally debonded with sheathing, goes through an opening where strand is removed, like a window, or when openings are cut through strand and into the member at a later date.

Understanding Pre-Stressed Concrete Behavior Under Loading Conditions

We have learned that the effective prestress, fse, is what keeps a pre-stressed concrete member in an uncracked state under service loads and fps is the stress in the strand at the members ultimate bending strength, when failure occurs. So, what happens in-between?  Usually, pre-stressed concrete members will remain uncracked under service loads, and have have some wiggle room to take more loading prior to strand breakage, to ensure a ductile failure. That way, we can detect impending failure by serious deformation and serious cracking, long before failure will occur.

Some minor cracking can be normal under service loading as well, depending on the size of the member, span of the member, number of strand, the loading criteria, etc.  What holds the pre-stressed concrete member together after cracking is the leftover tensile strength of the strand, and compression at the top of the member, (in typical positive moment bending).  Figure 7 shows a beam designed by students from Minnesota State University, Mankato, for the PCI big beam contest.  The contest specifies a loading condition to remain uncracked, and a higher loading condition to break. This beam has been loaded well above its cracking limit and below its ultimate bending strength. The beam still takes on loading, due to the tension in the strand crossing the cracks at the bottom of the member and the compression at the top of the member, informing us of an impending failure.

The Role of Strand Cutting in Pre-Stressed Concrete Construction

Now we know that by cutting strand, a squish is added to a concrete member, similar to Gustave Mangel’s stack of books. The strand must be tensioned in a concrete form, cut at a minimum concrete strength, enough effective stress applied to keep the member uncracked with all losses taken into account given enough transfer length; and a ductile failure will show serious cracking prior to member failure at ultimate bending stress given enough development length. Cutting strand is what turns the squished books into multi-level total precast pre-stressed concrete buildings.

Are you interested in learning more about Biodegradable Food Bag? Contact us today to secure an expert consultation!

What is meant by PC strands (Prestressed Concrete Strands)

PC strands, or prestressed concrete strands, are high-strength steel wires made up of individual steel wires twisted together in a helical pattern. They are specifically designed to withstand high tensile forces.

By introducing prestress to concrete, PC steel wire strands help to counteract the tensile forces that it may be exposed to, this can increase the load-carrying capacity. PC strand is widely used with concrete structures such as beams and columns.

Prestressed strands can increase the strength of concrete structures and are often used for large scale projects. Prestressed steel strand construction can vary in diameter, length, and finish.

PC strand

Construction uses of PC strand

Many construction projects can benefit from prestressed strand and consider it essential in their structure, including:

  • Bridges
  • Commercial buildings
  • Parking structures
  • Offshore platforms
  • Stadiums
  • Highway work
  • Mining
  • Parking garages

PC strand is a reliable way of adding bond strength to any concrete structure.

Benefits of using prestressed concrete steel strand

  1. Saves on construction materials: Its design with longer spans and smaller cross-sections make it more economical.
  1. Withstands rough weather conditions: It can retain its strength and integrity even in harsh environments, with corrosion resistant properties.
  1. Can carry heavy loads: Its high tensile strength makes it ideal for large structure projects.
  1. Wide range of sizes and strengths: There are many options in the market to choose from, to fit your project requirements.
Prestressed concrete strand

Mid-Continent Steel and Wire PC strand specifications

Our uncoated seven-wire PC Strand is manufactured under the highest quality standards. It is used in pretensioned and post-tensioned prestressed concrete constructions.

Construction: 1×7 270 ksi Low-Relaxation

Diameter: 0.50” (0.60” also available as MTO)

Min Elongation: 3.5%

Coil Length: 270 kft

Finish: Uncoated or Galvanized

1000-Hour Relaxation Testing: Successful Completion & Approval of ASTM A1061

Meets: ASTM A416

Want more information on Biodegradable Stretch Film? Feel free to contact us.