Concrete Wall Formwork Design 4

08, Jul. 2024

 

Concrete Wall Formwork Design 4

INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Read more

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!

  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
Join Us!

*Eng-Tips's functionality depends on members receiving . By joining you are opting in to receive .

Posting Guidelines



Students Click Here

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Eng-Tips Posting Policies

Contact US

4

thread507- Forum Search FAQs Links MVPs
  • Forum

  • Search

  • FAQs

  • Links

  • MVPs

Concrete Wall Formwork Design

Concrete Wall Formwork Design

bookowski

(Structural)

(OP)

26 Jul 12 17:09

When pouring a concrete wall(s) the worst case design pressure would be p = (w x h). If the wall is poured in lifts or at a slow rate then the concrete should be setting up and reduce that pressure, i.e. reduce the effective 'h'. The time required would vary by the particular mix, but are there any guidelines out there for this? ACI 347 notes 'for forms that can be filled rapidly before stiffening of the concrete takes place, h should be taken as the full height of the form'.

What would be a reasonable way to determine how long is required, or what pour rate, to not need the full 'h'?

(Assume that I can't provide ties to take the full w x h)

RE: Concrete Wall Formwork Design

Hoaokapohaku

(Geotechnical)

26 Jul 12 18:39

I know of no specific guidelines for this. It's important to consider what is referred to when waiting for the concrete to "set up" enough so the next lift can be poured. It is not initial or final set of the concrete; that would produce a cold joint. Rather, the setting needed before the next lift is placed is a product of false set; early stiffening of the concrete due to plaster rehydrating into gypsum or ettringite formation. The timing and amount of false set that occurs is a function of many variables including cement chemistry, time, temperature, w/c ratio, etc. The number of variables in play makes it nearly impossible to determine or predict how much time is needed between lift placement. Because of this, normally the contractor's foreman or the masons themselves make the determination by observation of the in place concrete. Generally, they are very good at it. They have learned the hard way what the concrete looks and feels like when the next lift can be placed.

RE: Concrete Wall Formwork Design

slickdeals

(Structural)

26 Jul 12 23:03

If you look in ACI 347, there are formulas to calculate maximum formwork pressure based on rate of placement (R). This can be found in Section 2.2.2.1. As you rightly said, you can reduce the rate of pour to reduce your formwork lateral pressure.

RE: Concrete Wall Formwork Design

bookowski

(Structural)

(OP)

26 Jul 12 23:23

Thanks.

I have seen some formwork design aids that provide pressure based on pour rate (feet per hour) but they seem to vary and I haven't seen much documentation on where they get their numbers.

For more information, please visit Zolo.

RE: Concrete Wall Formwork Design

3

slickdeals

(Structural)

27 Jul 12 07:39
http://www.concrete.org/tempComDocs/-/ci...

Also see attached for some class notes on temporary works
http://courses.washington.edu/cm420/

Attached is a good article on Formwork Pressures by Mary HurdAlso see attached for some class notes on temporary works

RE: Concrete Wall Formwork Design

PMR06

(Structural)

27 Jul 12 10:26

http://www.g-lumber.com/pdf/APA-Concrete-Formwork....

APA has some good design guides for formwork design. Here's a reference I've used many times:

RE: Concrete Wall Formwork Design

bookowski

(Structural)

(OP)

27 Jul 12 14:52

Thanks slickdeals and PMR, good info - just what I was looking for.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.


Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members! Already a Member? Login



News


5 Elements Of Superior Concrete Formwork

Concrete is the most commonly used man-made material on earth. Given its particular properties, it is also among the most widely employed options for construction. This mixture of cement, sand, gravel and water begins as a wet substance unable to support its own weight, thereby requiring the use of a mold to achieve the desired shape and structure. In construction applications involving concrete, that mold is referred to as the formwork.

Because formwork not only controls the concretes position and alignment, but also bears the weight of materials, equipment and workers, it must be expertly planned and applied. Here, were breaking down the specific elements of superior concrete formwork to help you develop an approach that meets the needs and specifications of your construction project.

1. Appropriate Material Selection

Concrete formwork, also sometimes referred to as shuttering, is the configuration of forms (or molds) that are utilized to create an overall shape for the concrete. Just as the applications for formwork are varied, so are the types of materials used. Following are some of the different categories of form materials available for concrete projects.

  • Timber: Timber, specifically plywood, is perhaps the most commonly used type of formwork material. Derived from trees, it is widely accessible, highly economical and available in a number of different species, sizes and grades. Timber is easy to cut and shape on the job site, and it is a reusable entity if managed and stored properly.
  • Steel: This is a stronger and more durable material, and it has the advantage of upholding longer stretches of reusability when appropriately maintained. While the material demands a higher upfront cost, it retains value for a lengthier span of time. Other advantages to steel forms include their ability to deflect moisture, warping and shrinkage, their exposed surface quality and their capacity to be erected and removed quickly.
  • Aluminum: This material is both strong and lightweight, making it a valuable source for certain formwork projects. Aluminum formwork is often prefabricated and then assembled on site. This material requires a higher initial expense, but its minimal weight brings down overall handling costs. Because pure aluminum is susceptible to corrosion, alloys are often applied to resist this effect.
  • Plastics: Two different types of plasticsglass-reinforced and vacuum-formedare sometimes employed for formwork applications. Although lighter than metal variations of formwork, plastic formwork is not as durable. Because it is a very flexible material, its often leveraged to form more nuanced shapes. It also produces a high-quality surface finish. While plastic formwork can be an economical choice that enables reuse, its important to note its vulnerability to sun and heat exposure.
  • Other: Newer (though less commonly employed) iterations of form material include options like fiberglass and fabric. Its important to consider a number of factors pertaining to the needs of your concrete project, such as cost, strength, weight, flexibility, durability, sustainability and reusability, before making an informed decision about which type of material (or combination thereof) is best suited to meet your requirements.

2. Considerations for Strength & Capability

Formworks fundamental role is to bear all the loads present while casting the concrete, as well as to retain its shape throughout the process. That means superior concrete formwork requires great consideration for:

  • Accurate load estimations
  • The properties and behaviors of the chosen form materials
  • The pros and cons of different forming systems

The design and application of your formwork should be based on its ability to produce the required shape and surface finish, withstand the necessary loads, prevent cement leakage throughout and enable the removal of formwork materials without incurring damage to the concrete. These are critical considerations to be made prior to the installation of concrete formwork.

3. Proper Rate of Pour Based on Height

Conventional concrete, when wet, can weigh from 140 to 150 pounds per cubic foot. Thats a lot of weight to account for when calculating the load capacity of concrete formwork. Because of this weight, theres a need to factor pressure into the equation, and pressure can be impacted by both the height and weight of the actual pour.

The greater the height of the poured concrete, the more lateral pressure is exerted on the interior of the formwork. Therefore, its important to integrate appropriate drying intervals into the rate at which the concrete is poured. This allows a portion of the concrete to cure and strengthen before adding more of it to the mold.

Otherwise, if too much concrete is poured all at once, immense pressure can cause the forms connecting devices to give way. When that happens, concrete can burst through the connections and out of the formworka messy, expensive and potentially hazardous outcome that could be avoided by ensuring a more sustainable pour rate.

4. Focus on Concrete Characteristics

The characteristics of the concrete itself can have an impact on the formwork and overall project. Thats why its important to understand, test and account for the properties of fresh concrete based on attributes such as:

  • Type: The choice of concrete mix will depend on factors like required strength and surface finish, performance needs, weather conditions, local codes and cost.
  • Weight: The unit weight of fresh concrete is determined by density, air content, water content and cement content.
  • Slump: This is the consistency of fresh concrete, or its ability to flow. The projects slump tolerances will determine how the consistency of the concrete must be managed.
  • Temperature: Temperature has a vital influence on the properties of fresh and hardened concrete, which is why minimum and maximum limits are specified. Variations in temperature can affect the rate of hydration, thereby impacting slump loss, rate of strength gain and setting and finishing times.
  • Vibration: When concrete is poured, it contains air bubbles that can substantially weaken the structure. Concrete vibrators are used to eliminate these bubbles by shaking the freshly poured concrete.

5. Safety Planning & Supervision

Because there are real hazards associated with applying concrete formwork, organizations like the Occupational Safety and Health Administration issue guidelines around it. Its important to heed these guidelines and enforce adequate safety planning.

Without proper safety precautions, theres risk of experiencing the kinds of accidents and liability that stem from improperly designed formwork, hurried removal of forms, bends and breaks during the pouring process and so on.

The best way to mitigate dangerous risks is to partner with a construction expert with the knowledge and experience to plan ahead, leverage a qualified staff and ensure proper supervision.

For more information, please visit concrete wall formwork.