Many do-it-yourselfers consider themselves capable of pouring their own metal building foundations. They poured the cement for their fence posts, didn’t they? And one summer they helped Uncle Bob pour the floor for his 6’ x 8’ tool shed. So what is the big deal? The big deal is QUALITY. Foundations for steel framed buildings are designed, engineered, and manufactured to exact tolerances. There is no room for error in a metal building. Foundations for steel buildings need to be precise in size. The foundation walls must be straight. The slab must be squared. The connections have to align perfectly, so all the framing connects and squares correctly. Corners should be crisp. The tops of the foundations should be level and straight. For professional results, let a qualified professional concrete contractor do the job. The local concrete company will have a list of concrete contractors available.

If you are looking for more details, kindly visit KAIYAO.

What You Need to Know About Metal Building Foundations

Here are a few tips to consider when pouring slabs, piers, or perimeter walls for steel buildings:

  • Cement and concrete are not the same thing. Cement holds concrete together. Cement, sand, gravel, and water mixed together create concrete.

  • Concrete is purchased by the cubic yard. A concrete engineer determines the amount of concrete needed, based on your metal building plans, the projected weight of vehicles or heavy equipment used in the structure, local soil conditions and building codes.

  • If soil conditions are poor, you may find it less expensive to bring in a better grade of dirt than to pour a deeper foundation for a large steel structure. Discuss this possibility with your concrete contractor or engineer.

  • If possible, do not plan to pour foundations for steel framed buildings in the dead of winter. Concrete cures best when poured between 45° and 90° Fahrenheit.

  • Frost heave may crack curing concrete foundations. If the temperature plummets below freezing in the first 24 hours after pouring, the concrete may lose as much as half of its projected strength.

  • Allow plenty of time for the foundation to cure completely. Plan the arrival of your steel building a minimum of three days after the pouring of foundations in warm weather. For best results, allow the concrete to dehydrate for two weeks or more.

  • The colder the weather, the longer it takes a foundation to cure completely.

  • Building on a slab that is not completely dehydrated sometimes causes condensation within the structure. That is a lot bigger problem that you may think. A 5,000 sq. ft. concrete slab poured 4” deep may produce over 1,200 gallons of water vapor inside the structure! During winter construction, proper ventilation is paramount. Leave a few exterior steel panels off until the foundation cures completely.

  • You have no doubt seen those ultra-fast construction jobs on “Extreme Makeover: Home Edition.” Chemical accelerators mixed into the concrete speed drying time on some of these projects. However, avoid using the additive calcium chloride for your building foundation. It is extremely corrosive to the steel in the foundation.

  • Set your anchor bolts with templates to assure correct location in the slab. Check all the anchor bolts again immediately after installation of the concrete to be sure the bolts remained straight and true.

Ask the Experts at RHINO

Questions about Pre-engineered Steel Buildings

Structural steel buildings, also known as conventional steel, are constructed onsite using a blend of materials (steel, wood, masonry etc.). They provide more flexibility in build for complex designs.

Pre-engineered steel buildings are fabricated as a kit off-site and then quickly erected on site. They are more cost-effective, easy to maintain and simpler to build.

A typical building comes with 10 to 14 inches insulation in the roof (R40 value) and six inches in walls (R20), however, we can customize a design to suit your specific needs. We also specialize in high quality insulated metal panels—also known as sandwich panels—to meet today’s stringent energy codes.

Yes, a pre-engineered steel building is the most cost-effective building type to support the weight of a overhead crane indoors. In more complex builds, structural steel may be the better option. The third option is a precast building. The likes of wood and block buildings are expensive in design for the support needed.

In Canada, pre-engineered steel buildings must comply with both provincial and local building codes, incorporating specific environmental factors—such as snow load, rain load, wind load, seismic loads, and soil class—relevant to the building site’s geographic location. While these loads are typically specified by provincial codes, it’s best practice to confirm with the local Authority Having Jurisdiction (such as the city, town, district, or county) since additional requirements or stricter standards may apply beyond those outlined in provincial codes.

If you can dream it, we can build it. But here are common private shops, commercial buildings and industrial uses to inspire you.

  1. Industrial equipment storage
  2. Commercial mini/self-storage units
  3. Commercial office space; great for open plan workspaces
  4. Retail buildings (e.g. auto body shops, furniture stores, warehouses or factories)
  5. Manufacturing plants
  6. Industrial gas, mining, and oil, or power
  7. Personal home shops
  8. Refrigerated or heated spaces for climate-controlled storage

To learn more, read our blog: 4 Popular Commercial Uses For Prefabricated Steel Buildings.

Absolutely, we recommend setting your brand apart from the competition by applying a colour coating on your steel building. 

To learn more, read our blog: Why Coatings of Metal Building Kits Matter for Commercial Projects.

Are you interested in learning more about steel flooring? Contact us today to secure an expert consultation!

The most significant advantage is simplicity. MSC is a one-stop-shop for planning, design, supply and install. The only element we don't provide is the building foundation. Often, pre-engineered steel is the most cost-effective option compared to other buildings types (typically 20% less), but that depends on the building's needs.

With pre-engineered steel builds, we are qualified to offer a complete building service. It starts with planning for your building, then we design to meet your building needs and external factors (terrain, climate temperatures, building end use, etc), and then build it—walls, roof, and insulation, including window and door install!

Typically, your building package will be delivered to the site within eight to 14 weeks of the order date—depending on low to high complexity. In general, the less complex the building design is, the faster you will receive the package.

This depends on the complexity of the steel building, but pre-engineered steel is the fastest in construction. To give you an example, a 10, 000 square foot building of low complexity—from conception to design to completion of the project on site—would typically take five months . However, a steel building with higher complexity can take up to seven months, all in.

We design and build steel and pre-engineered metal buildings in the commercial, industrial, retail, and farming industries, as well as structures for storage, and community or multiple-purpose uses. We also build shops on private properties for personal uses. You can see examples of our past projects here.


Yes, you can. There are no additional charges for minor updates, for example, adding a window or moving a door. For more significant changes, like adding extensive square footage, then re-engineering and re-design fees may apply.

Pre-engineered buildings are designed to go up quite fast, and our preferred crews are some of the most efficient in the industry. The average steel building size is about 5,000 to 20,000 square feet, which would take roughly four to 10 weeks to erect, depending on complexity, work and weather conditions and other factors.

To work out the project budget, we will ask you a few questions to better understand what your needs are.

  • What do you want to do in the building?
  • What's the purpose of the building?
  • Do you own the land?
  • Where are you building?
  • Do you have financing in place?

To learn more, read our blog: Cost Factors For Pre-Engineered Steel Buildings.

The actual metal structure itself can be built any time of year. But there are other parts to the project to consider, mainly the concrete and foundation. The Interior BC, Kootenays, Alberta, or Northern BC, mid-October is when it may get too cold, and you would consider waiting to start doing the concrete work and foundation until the Spring.

To learn more, read our blog: How Weather And Location Affect Project Timing.

We get many of our buildings from our Canadian supplier, out of Brandon, Manitoba. Our other two suppliers are out of the US.

Our buildings are insulated and protected from the elements. These buildings are the perfect choice to build a dairy barn, hog barn, or cattle barn, keeping your hay, grain, and animals warm and protected from the weather outside. Check out pre-engineered farm buildings here.

To learn more, read our blog: 7 Benefits of Steel Barns for Agriculture.

Pre-engineered metal buildings are used for so many different applications, but one sector they’re gaining popularity in is the retail industry. Store owners recognize that the space in which they operate is just as important as the product and services they sell.

To learn more, read our blog: Why Metal Building Kits Are Ideal For Retail Outlets.

We can erect any sort of commercial building that you need to start or grow your business.

  • Automotive shops
  • Storage facilities
  • Gas, mining, and oil industries
  • Distilleries, wineries, and agriculture
  • Food processing
  • Gas stations

For a full list of our commercial projects, click here.

We have worked with the forestry, gas, mining, and oil, hydro/dam, steel fabrication, utility, and renewable energy sectors as well as manufacturing and commercial to design and install buildings they need to run their corporation.

For a full list of our industrial projects, click here.

Want more information on stainless steel floor tile? Feel free to contact us.